SEPTEMBERSEP. 2026 SPECIAL$1,500 OFFYour Dream Kitchen or BathroomDream Kitchen or Bath+ FREE 3D Design Layouts
(916) 269-0761
Deck Builder in San Rafael
Serving San Rafael & SurroundingServing San Rafael & Surrounding Areas

Deck Builder in San Rafael

GVD designs and builds decks in San Rafael and nearby San Anselmo and Larkspur, with airflow and board choices suited to marine damp. One project manager runs the job from footings to railing.

GVD RenovationsRated 4.9/5 from 921+ online reviews

Sep 2026 Special

Your San Rafael Deck Project — Up to $1,000 Off

*Full deck installation. 225 Sq. Ft. minimum. Offer Expires 9/30/26

Request a FREE No-Obligation Quote & Expert Advice!

No obligation, no pressure
*By submitting this form, you consent to receive calls and texts from us about your project. Msg/data rates may apply. Reply STOP to opt out.
*By submitting this form, you consent to receive calls and texts from us about your project. Msg/data rates may apply. Reply STOP to opt out.
CA Lic. #9896374.9/5 across 921+ Online ReviewsA+ BBB rating
At a glance

A San Rafael deck project, at a glance

What most San Rafael homeowners can expect from a GVD deck build, from the most common material to how long construction takes.

Most common buildComposite, $17,000–$30,000
Construction time1–3 weeks after permits
Permit usually neededAttached, over 30 in. high, or over 200 sq ft
Permits (when required)City of San Rafael or Marin County

Key Takeaways

  • A footing and framing inspection has to pass before any decking goes down, which is what sets the schedule more than the size of the deck does.
  • Elevated and second-story decks cost more because they need deeper engineered footings and additional structural support, not because of the decking surface.
  • Decking samples, railing systems, and color options can be seen in person at GVD's showroom on Five Star Blvd in Rocklin before anything is ordered.
  • Framing, footings, and railing cost roughly the same regardless of what decking goes on top, so the surface material drives most of the gap between two quotes.
  • Capped composite has a wood-fiber core with a protective shell; full PVC has no wood content at all, which is what puts it in a higher price tier.
  • Most residential deck replacements finish in one to three weeks once permits clear.

Deck building with GVD Renovations

From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through the City of San Rafael or Marin County, and construction in San Rafael. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby San Anselmo, Larkspur, and Fairfax, and every design starts with a measurement of your grade and attachment point.

The first material decision on a deck is whether you want to sand and reseal wood on a recurring cycle or move to a composite or capped board that skips that cycle. That choice shapes what you do every few seasons far more than the color you pick at the showroom. We walk you through both paths at the estimate so you choose the maintenance commitment before you choose the board.

We commit to a firm total price before work starts, which is possible because the structural scope gets settled at the estimate rather than discovered during framing.

What a deck costs in San Rafael

Footings and framing are the majority of most deck quotes, and they sit under the surface where homeowners tend to look last. The boards you focus on are the smaller share of the total, so understanding the structure below them keeps the whole number in perspective before you call.

Height above grade is the variable homeowners underestimate. It drives the footing depth, the structural support, the guardrail requirement, and the permit path all at once.

Composite, standard size ($17,000–$30,000)Capped composite boards from Trex, TimberTech, or DuraLife over pressure-treated framing, finished with composite railing. The build we do most often.
Redwood ($25,000–$35,000)Redwood decking and railing on treated framing. A premium material rather than a budget one, which is why it sits above composite here, and it needs refinishing on a regular cycle.
Full PVC or stone surface ($30,000–$45,000)Full-PVC boards such as the AZEK line, or a stone or tile surface over a waterproofed substrate. The choice where maximum moisture and stain resistance matters.
Large custom, covered, or waterproofed ($45,000–$100,000+)Covered structures, multiple levels, integrated lighting or benches, or a deck that doubles as a roof over living space. Most of the cost sits in engineering and framing.

If the budget is the binding constraint, the entry point is around $5,000 for a small ground-level pressure-treated deck under 100 square feet.

Our main decking page walks through pricing in more detail.

Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.

Wood, composite, and PVC compared

None of these three is wrong for every deck. What is wrong is choosing on upfront price without knowing what the upkeep commitment looks like.

AttributeRedwoodCompositeFull PVC
Installed costAbove standard compositeThe most common buildAbove both
MaintenanceRefinishing on a regular cycleRinse and mild soap, no sealingRinse and mild soap, no sealing
Surface in direct sunStays closer to air temperatureDarker colors absorb more heatDarker colors absorb more heat
Moisture and stain resistanceGood for a natural material, but it is still woodStrong; capped boards resist stainingStrongest of the three
LookNatural grain that weathersConsistent, wood-look textureConsistent, the least wood-like

Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.

In San Rafael's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.

Trex, TimberTech, and DuraLife

There is no categorical quality gap between the major composite lines. There is a real gap between composite and PVC, and it shows up in the price.

We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).

Do you need a permit to build a deck in San Rafael?

Guardrail height, stair geometry, and ledger attachment are all inspected where a permit applies, and the City of San Rafael or Marin County determines whether your project reaches that threshold.

Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.

If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the City of San Rafael or Marin County as part of the job.

Deck code requirements and inspections

Inspections on a deck happen while the structure is open, which is the only time the connections can be verified at all.

California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.

A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.

Elevated and second-story decks

Elevated construction is routine work, but it is not the same work, and a quote that prices it like a ground-level deck has missed something.

The structural half of a deck quote is the half that varies most between properties, because it follows the site rather than the plan.

Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.

How we build your deck

What follows is the order the work actually happens in, from the measurement through the final walkthrough.

1Measure the site and design a layout that fits the lot and the grade.
2Choose decking, railing, and color from samples in Rocklin or at home.
3Submit plans to the City of San Rafael or Marin County when a permit is required.
4Set footings and frame the structure, then pass the framing inspection.
5Install decking, railing, and stairs.
6Final inspection, cleanup, and walkthrough.

The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.

How long a deck takes to build

Most projects are one to three weeks from the first day on site to final sign-off, assuming the permit is already through.

Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.

Maintaining your deck

Most complaints about composite appearance after a few years trace to cleaning that never happened rather than to the board itself.

Rinse and sweep regularlyso grit does not grind into the board surface underfoot.
Avoid bleach and ammonia-based cleanerswhich can discolor the cap layer on some lines.
Move planters and dark furniture periodicallyso the deck does not hold uneven moisture underneath them.
Wash with mild soap and watera few times a year; a diluted dish soap solution is safe on capped composite and PVC.
Go easy with a pressure washerhigh pressure up close can damage the protective cap.

Why San Rafael homeowners hire GVD Renovations

We carry several decking lines rather than one, so the recommendation follows what your project needs instead of what a single supplier stocks. On a wood build we point you toward a maintenance cycle you accept; on a capped or composite build we match the board to how the deck will be used. Our in-house crews, who self-perform most of the work, frame and finish the deck, so one accountable team stands behind the ledger, the footings, and the surface. When a permit is required, GVD handles the permitting process with the City of San Rafael or Marin County, depending on where your property falls. On homes at this end of the market, median value here is $1.34 million that structural work is what protects the investment underneath the finish.

One team from quote to walkthroughthe people who measure your site are part of the team that builds it.
Showroomdecking, railing systems, and color options can be seen in person at 6848 Five Star Blvd #6 in Rocklin, about 104 miles from San Rafael (roughly a 2-hour drive), before anything is ordered.
One project managerscheduling, inspections, and questions go through one person from start to finish.
Licensed and insuredlicense #989637, liability and workers' compensation coverage on every job. You can check it at cslb.ca.gov.
Fixed pricingthe full scope and one total in a detailed digital proposal before the first footing is dug.

Our deck submittals are prepared for what the City of San Rafael or Marin County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.

Recent deck projects near San Rafael

Recent deck building projects we have completed in nearby communities:

  • James Hardie Siding Shed Deck And Railings in Mill Valley (94941)

Serviced ZIP Codes: 94901, 94903, 94912

Deck Builder Near San Rafael

We bring the same crews, materials, and workmanship to every community around San Rafael.

Frequently Asked Questions
about Deck Installation & Replacement in San Rafael

How much does a new deck cost in San Rafael?

A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.

Do I need a permit to build a deck in San Rafael?

Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of San Rafael or Marin County.

How long does it take to build a deck?

Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.

Is composite or redwood better for a deck?

Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.

Which decking brands does GVD install?

Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.

Can I see decking materials before I decide?

Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.

4.9921+ Reviews

Build Your New Deck in San Rafael

From footings to railing, GVD builds decks across San Rafael, San Anselmo, and Larkspur at one fixed price in a detailed proposal.

(916) 269-0761
Duralife
Timbertech
Deckorators
Dekpro
Fiberon Decking
Barrette Outdoor Living