
A new Novato deck designed for mild, sunny conditions: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving San Rafael and San Anselmo.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Novato homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
Homeowners in Novato hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Novato or Marin County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby San Rafael, San Anselmo, and Larkspur, and every design starts with a measurement of your grade and attachment point.
Whether a deck attaches to the house and how far its surface sits above grade are, along with size, the main facts that decide whether it needs a permit, and neither can be judged from the ground alone. GVD establishes the attachment method and the height above grade at the estimate, then applies whatever the City of Novato or Marin County requires for that specific structure. When a permit is required, GVD handles the permitting process.
The work is managed in-house end to end, which is what keeps the schedule and the inspection sequence under our control rather than a supplier's.
Footings and framing are what sit under the boards, and on most deck quotes they make up the majority of the total, while the decking material homeowners focus on is a smaller share. Knowing that split before you call keeps the board conversation in proportion to the structure carrying it.
Three things move a deck budget more than the board selection does: the size, whether the deck needs new footings, and how far it sits above grade.
Composite deck replacement, standard size, $17,000 to $30,000. Trex, TimberTech, or DuraLife boards on treated framing with composite railing. No sealing cycle, and the most common build GVD does.
Wood deck replacement, redwood, $25,000 to $35,000. Redwood boards and railing over treated framing. Chosen for its natural grain rather than to save money, and it asks for periodic refinishing.
Premium PVC or stone-surface deck, $30,000 to $45,000. No wood content at all: full-PVC boards, or a stone or tile surface on a waterproofed base. The top performer against moisture and stains.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Covered structures, multiple levels, integrated lighting or benches, or a deck that doubles as a roof over living space. Most of the cost sits in engineering and framing.
As a floor reference, a ground-level pressure-treated deck under 100 square feet comes in near $5,000, well below the standard replacement tiers above.
The complete cost breakdown is on our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Because redwood prices above standard composite, there is no payback period to calculate. Composite is both the lower-cost build and the lower-maintenance one, and wood is chosen for the look rather than the budget.
In Novato's mild, sunny climate the stressor is UV rather than heat or damp. Capped composite and PVC hold their color better than unsealed wood, and a lighter board keeps the surface more comfortable on sunny afternoons.
The fastener and railing system is worth as much attention as the board, since it determines how the finished deck looks from three feet away.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Homeowners should expect any attached or elevated deck to be reviewed by the City of Novato or Marin County, and should treat a proposal to skip that step as a warning rather than a saving.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
When a permit is required, we draw the plans, submit them to the City of Novato or Marin County, and schedule each inspection ourselves.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Height above grade changes the guardrail requirement, the footing depth, the post sizing, and the number of inspection stages, all at once.
Around Hamilton and Bel Marin Keys, whether a deck is a ground-level platform or an elevated structure is decided by the fall of the individual lot rather than by the area.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
This is the standard sequence across the trade. A contractor proposing to reorder it should be able to say exactly why.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
Crews are typically on a deck replacement for one to three weeks. Permit review and material lead time both sit outside that window.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Wood adds refinishing on a cycle to everything below. That is the maintenance difference between the materials, and it is the whole of it.
A deck's structural scope is set by your site, so we put the full scope and one fixed price in a detailed digital proposal, and the number you approve is the number you pay with no surprise charges once the crew is on site. On a Novato lot where footings and grade drive the framing, that detailed total is what protects you from a job that grows after digging starts. Our in-house crews, who self-perform most of the work, carry the work from measurement through the final walkthrough, so one team stays accountable for the ledger, footings, and finished surface. We have taken deck framing through plan review with the City of Novato and Marin County, so we know which attachment and footing details reviewers ask about before an inspection is scheduled.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Novato.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Novato or Marin County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















