SEPTEMBERSEP. 2026 SPECIAL$1,500 OFFYour Dream BathroomDream Bathroom
(916) 269-0761
Bathroom Remodeling in Davis
Serving Davis & SurroundingServing Davis & Surrounding Areas

Bathroom Remodeling in Davis

From tub-to-shower conversions to full layout changes, GVD remodels bathrooms in Davis and nearby Winters and West Sacramento, with one firm price in a detailed proposal.

GVD RenovationsRated 4.9/5 from 921+ online reviews

Sep 2026 Special

Save $1,500 on Your Davis Bathroom Remodel

*Terms apply. Offer Expires 9/30/26

Request a FREE No-Obligation Quote & Expert Advice!

No obligation, no pressure
*By submitting this form, you consent to receive calls and texts from us about your project. Msg/data rates may apply. Reply STOP to opt out.
*By submitting this form, you consent to receive calls and texts from us about your project. Msg/data rates may apply. Reply STOP to opt out.
CA Lic. #9896374.9/5 across 921+ Online ReviewsA+ BBB ratingNARI and NKBA member
At a glance

A Davis bathroom remodel, at a glance

The typical numbers for a Davis bathroom project, from the scope most homeowners choose to how long the work takes.

Most common scopeMid-range, $30,000–$55,000
Typical timeline2–8 weeks
Hidden-conditions reserve15–20% of scope
Permits (when required)City of Davis or Yolo County

Real Davis-Area Bathroom Remodels: Before & After

A look at real bathroom remodels GVD has delivered around Davis.

Before
BEFORE
After
AFTER

Key Takeaways

  • A slab shower surround costs more to install than tile and has no grout to reseal; tile costs less and offers far more design range.
  • A bathroom remodel commonly falls between $18,000 and $100,000 or more depending on scope, with most projects landing in the middle tier.
  • Old cast-iron or galvanized drain lines and a failing subfloor are the two findings that most often move a bathroom budget after demolition starts.
  • A realistic budget starts with what the bathroom needs structurally, then allocates what is left to fixtures and finishes.
  • Every GVD quote is fixed-price and delivered as a detailed digital proposal before work starts, so the number approved is the number paid.

How GVD approaches a bathroom remodel

GVD Renovations remodels bathrooms in Davis at every scale, from new fixtures and tile in the existing footprint to full guts that move plumbing and reconfigure the room. Design, any required permits through the City of Davis or Yolo County, construction, and cleanup run as one job under one project manager. That includes homes around Wildhorse and Mace Ranch, and we also work in nearby Winters and West Sacramento.

Bathroom projects go wrong at the transitions more often than at any single trade. GVD runs demolition, rough-in, waterproofing, tile, and finish as one job with one point of contact.

We are a family-owned Northern California contractor (license #989637) with liability and workers' compensation coverage on every job.

How much a bathroom remodel costs in Davis

The two things that move a bathroom budget after demolition starts are the condition of the subfloor and the material the drain lines are made of, and neither is visible until tile and flooring come off. We assess both at the estimate so the concealed conditions are priced into the firm total rather than surfacing as a change once the crew is on site.

ScopeTypical rangeWhat changes
Focused update$18,000–$30,000Vanity, tile, fixtures; plumbing stays put
Mid-range remodel$30,000–$55,000New wet zone, lighting, ventilation; most common
Primary bath with a layout change$55,000–$100,000+Moved plumbing, new layout, custom shower

The full cost breakdown lives on our main bathroom remodeling page.

Add 15 to 20 percent to whichever tier fits. If nothing turns up you keep it, and on an older home something usually turns up.

Homes near Wildhorse and Mace Ranch were not all built to the same plumbing standards, which is why the assessment happens at the property rather than by area. The usual findings are corroded cast-iron or galvanized drains and a subfloor softened by years of slow leaks. Neither shows up until the floor is open, which is why the budget should cover what the room needs structurally before it is divided among fixtures and tile.

When quotes look wildly different, check which tier each one assumes first. A focused-update price and a layout-change price are not pricing the same project.

Quartz versus tile for a shower surround

Quartz and tile solve the same problem at different price points and with different upkeep, and the choice usually comes down to how much cleaning you want to sign up for.

SurroundRelative installed costMaintenanceBest suited to
Quartz or solid-surface slabHighest of the threeWipe down; no grout to resealOwners prioritizing low upkeep over pattern choice
Ceramic or porcelain tileLowestPeriodic grout resealingThe widest range of pattern, color, and format options
Natural stone tileBetween the twoSealing on a regular cycleA specific stone look, accepting the upkeep that comes with it

A slab surround goes up in a few large pieces with very few seams, which is why it costs more to fabricate and install and also why it is easier to live with: there is no grout line for mildew to settle into. Tile costs less upfront and gives far more design range, but the grout needs periodic resealing.

Tub-to-shower conversion or a full bathroom remodel?

Homeowners often arrive certain they want a conversion and leave having decided on a full remodel, or the reverse. Both outcomes are fine; deciding without asking is not.

If the tub is the only thing wrong (it is hard to step over, rarely used, or the surround grout keeps growing mold), a conversion replaces it with a walk-in shower and leaves the rest of the room untouched, at a fraction of full-remodel cost. When the vanity is undersized, the layout does not work, or the floor is going too, doing the whole room at once is usually the cheaper path over time.

Our shower replacement page for Davis covers conversions and walk-in builds in depth, including what each route costs on its own.

Do you need a permit to remodel a bathroom in Davis?

Where a project changes the plumbing layout, the electrical, or the framing, a permit is typically part of the job. The City of Davis or Yolo County sets the threshold, and GVD confirms it against your scope at the estimate.

The trigger is usually the work behind the wall. Surface and fixture swaps typically do not need a permit; relocated plumbing, new circuits, framing changes, and curbless shower conversions typically do, and those are inspected at rough-in and at final.

If the work calls for a permit, GVD files it with the City of Davis or Yolo County and coordinates each inspection, so you are not tracking it yourself.

The order a bathroom remodel should be done

Trade sequencing is where a remodeling specialist earns the difference over a generalist, because the plumbing-to-tile-to-fixture handoff happens on every single project.

1Demolitiondown to studs and subfloor.
2Rough plumbing and electricalincluding new or relocated supply lines, drains, and circuits.
3Rough-in inspectionwhere a permit applies, before anything is closed up.
4Waterproofing and drywallcement board or a membrane in wet areas, moisture-resistant drywall elsewhere.
5Tileon the floor and shower walls once the substrate is sealed.
6Fixturestub or shower pan, toilet, and sink.
7Vanity and cabinetryset once the rough-ins line up.
8Paint, trim, and hardwarelast, so tile work cannot damage them.

Sequence controls cost and schedule. Tiling before the rough-in passes inspection risks tearing out finished work, and painting before tile usually means repainting scuffed walls.

How long a bathroom remodel takes

Budget 2 to 8 weeks depending on the tier. Curing time for waterproofing and tile is part of that and cannot be shortened.

Three things stretch a schedule: waiting on permit review, waiting on special-order tile or slab, and repairing what demolition uncovers, such as old drain lines or dry rot.

How to vet a bathroom remodeling contractor

Before comparing totals, confirm you are comparing companies on the same footing, quoting the same tier and the same assumptions about what is behind the wall.

Check the Contractors State License Board record first, then get in-home quotes from two or three companies. A walkthrough produces a far more accurate number than a phone estimate, because what moves a bathroom budget is not visible over the phone.

Verify the license and insurance

Search the contractor's license at cslb.ca.gov, confirm it is active and free of disciplinary actions, and request certificates for liability insurance and workers' compensation. Without workers' comp, an on-site injury can become the homeowner's problem.

Warning signs in a bathroom quote

  • A heavy deposit requested before anything has been ordered or filed.
  • No license number or insurance certificate on request.
  • No answer on who files the permit when the work clearly needs one.
  • No detailed scope, just a price.
  • Urgency to sign before you have compared quotes.

Why Davis homeowners choose GVD Renovations

We quote both focused updates, such as a new vanity, tile, and fixtures in the existing footprint, and full layout changes that move the tub, shower, or plumbing walls, so the recommendation follows what your bathroom needs rather than a single product line we happen to push. Our in-house team self-performs most of the demolition through the final walkthrough, which means the person who set the shower pan is the person accountable when it is tested. A national franchise routes that same work through rotating out-of-area crews who leave when the job ends.

Our A+ BBB rating reflects how jobs are run: a single project manager coordinating every trade, and one accountable team from quote to walkthrough.

Having worked through plan review with the City of Davis or Yolo County before, we know how local inspectors approach a bathroom rough-in.

You can see tile, quartz slabs, and cabinetry in person at our design showroom at 6848 Five Star Blvd #6 in Rocklin, about 35 miles from Davis (roughly a 45-minute drive), and lock in selections with a designer before construction starts.

Recently Completed Bathroom Projects Near Davis

Guest & Master Bathroom Remodel with Spa-Style Upgrades in Davis

Guest & Master Bathroom Remodel with Spa-Style Upgrades

Davis, CA 95618

Guest Hall Bathroom Remodel in Fair Oaks

Guest Hall Bathroom Remodel

Fair Oaks, CA 95628

Refreshing Master Bathroom Remodel in Roseville

Refreshing Master Bathroom Remodel

Roseville, CA 95678

Full Master, Hall, & Guest Bathroom Remodel in Granite Bay

Full Master, Hall, & Guest Bathroom Remodel

Granite Bay, CA 95746

Two Bathrooms Remodeled in Roseville

Two Bathrooms Remodeled

Roseville, CA 95747

Hall Bathroom Remodel in Loomis

Hall Bathroom Remodel

Loomis, CA 95650

Guest Bathroom Remodel in El Dorado Hills

Guest Bathroom Remodel

El Dorado Hills, CA 95762

Master & Guest Bath Remodel in Rocklin

Master & Guest Bath Remodel

Rocklin, CA 95677

High-End Master & Guest Bath Transformation in El Dorado Hills

High-End Master & Guest Bath Transformation

El Dorado Hills, CA 95762

Serviced ZIP Codes: 95616, 95618

Watch What Some of Our Clients Have to Say

Trusted by Thousands of Homeowners Across Northern California

Bathroom Remodeling Near Davis

We bring the same crews, materials, and workmanship to every community around Davis.

Frequently Asked Questions
about Bathroom Remodels in Davis

What should I budget for a bathroom remodel in Davis?

Most GVD bathroom projects in Davis fall into three tiers: a focused update at $18,000 to $30,000, a mid-range remodel at $30,000 to $55,000 (where most projects land), and a primary bath with a layout change from $55,000 to $100,000 and up. Whether the plumbing moves is the biggest price driver.

How long does a bathroom remodel take?

Most bathroom remodels take 2 to 8 weeks. Permit review, special-order tile or slab, and repairs found during demolition are the usual variables.

Does a bathroom remodel in Davis require a permit?

It depends on the work. Replacing fixtures in place usually does not; moving drains, adding circuits, or changing walls usually does. When a permit is required, GVD handles it through the City of Davis or Yolo County.

Is a tub-to-shower conversion enough, or do I need a full remodel?

If the tub is the only problem, a conversion fixes it for a fraction of the cost. If the layout, vanity, or flooring is also failing, a full remodel avoids paying twice. We quote both, so the recommendation follows the room.

How much contingency should I set aside for a bathroom remodel?

Budget 15 to 20 percent beyond the quoted scope for concealed conditions such as old cast-iron or galvanized drains and a damaged subfloor. On pre-1980 homes that reserve often gets used.

Can I see materials before my bathroom remodel starts?

At our Rocklin showroom on Five Star Blvd. You can compare tile, slabs, vanities, and fixtures in person and lock in selections before construction starts.

4.9921+ Reviews

Start Your Davis Bathroom Project

From a vanity refresh to a full layout change, GVD remodels bathrooms in Davis and nearby Winters and West Sacramento at one firm price.

(916) 269-0761
American Standard
Kohler
Toto
Moen
Grohe
Silestone
Cambria
Delta