
Loomis bathroom remodeling scoped at your house, not over the phone, for homes in Loomis, Penryn, and Roseville, with permits handled when required and a fixed price in a detailed digital proposal.
See real GVD bathroom remodels across Loomis and nearby Northern California communities — tub-to-shower conversions, walk-in showers, and full gut renovations, each priced in a detailed fixed-price quote.
Tap images to enlarge
See More Recent Projects →What most Loomis homeowners can expect from a GVD bathroom remodel, before the details of their own room are measured.
Genuine before-and-after results from recent GVD bathroom projects near Loomis.
A bathroom remodel in Loomis can be anything from a focused update inside the existing footprint to a full gut with relocated plumbing and a new layout, permitted and inspected where required under the building code enforced by the Town of Loomis or Placer County. GVD Renovations runs design, permitting, construction, and cleanup as one coordinated job, with a single project manager from the first site visit to the final walkthrough. We also remodel bathrooms in nearby Penryn, Roseville, and Sun City Roseville.
Our project managers are GVD staff, and the same one owns your bathroom from the first site visit through the final walkthrough. On a project with this many trades, that continuity is what holds a schedule together.
GVD Renovations is family-owned and fully insured, with liability and workers' compensation coverage, under California license #989637.
Whether your supply lines and drains stay exactly where they are is the single largest lever on the final number, because moving them means opening walls or floor and rerouting rough-in. Settling that question before you call keeps the estimate anchored to the work you actually want.
Focused update, $18,000 to $30,000. Surfaces and fixtures change (vanity, tile, toilet, faucets) while supply lines, drains, and the layout stay put.
Mid-range remodel, $30,000 to $55,000. Every visible surface replaced, the tub or shower rebuilt (often as a walk-in or a conversion), and lighting and ventilation upgraded. Most bathrooms we quote fall here.
Primary bath with a layout change, $55,000 to $100,000 and up. A re-planned room: relocated fixtures and drains, custom cabinetry, and a custom shower. Common when a primary bath is being converted to a spa-style or accessible layout.
The full cost breakdown lives on our main bathroom remodeling page.
The contingency is not padding. It is the acknowledgment that plumbing, framing, and subfloor conditions are unknown until demolition, and 15 to 20 percent is the standard reserve.
The structural starting point differs from house to house, so the tier a bathroom belongs in is determined at the property rather than assumed from the area. The usual findings are corroded cast-iron or galvanized drains and a subfloor softened by years of slow leaks. Neither shows up until the floor is open, which is why the budget should cover what the room needs structurally before it is divided among fixtures and tile.
Settle which of the three your bathroom actually needs before comparing quotes. Two contractors pricing different tiers will produce numbers that look far apart for reasons that have nothing to do with either one being expensive.
Neither surround is the upgrade the other is sometimes made out to be. A slab buys low upkeep, tile buys design range.
| Surround | Relative installed cost | Maintenance | Best suited to |
|---|---|---|---|
| Quartz or solid-surface slab | Highest of the three | Wipe down; no grout to reseal | Owners prioritizing low upkeep over pattern choice |
| Ceramic or porcelain tile | Lowest | Periodic grout resealing | The widest range of pattern, color, and format options |
| Natural stone tile | Between the two | Sealing on a regular cycle | A specific stone look, accepting the upkeep that comes with it |
The trade-off is seams. Slab has almost none, so cleaning is a wipe-down, but fabrication and installation cost more. Tile wins on budget and design range, as long as you are willing to reseal the grout on a schedule.
We quote both, so there is no reason for us to steer this decision. The scope that fits the bathroom is the one worth doing.
If the tub is the only thing wrong (it is hard to step over, rarely used, or the surround grout keeps growing mold), a conversion replaces it with a walk-in shower and leaves the rest of the room untouched, at a fraction of full-remodel cost. When the vanity is undersized, the layout does not work, or the floor is going too, doing the whole room at once is usually the cheaper path over time.
Our shower replacement page for Loomis covers conversions and walk-in builds in depth, including what each route costs on its own.
A permit is required for a Loomis bathroom remodel when the work touches plumbing, electrical circuits, or structural framing, while cosmetic swaps of fixtures in the same location typically do not need one. The Town of Loomis or Placer County applies that test to the specific scope.
Swapping a toilet, faucet, or vanity in place generally does not need a permit. Moving a drain line typically does, and so do adding a circuit for a heated floor, relocating a wall, or building a curbless shower. When a permit applies, plumbing, mechanical, and electrical work is inspected at rough-in and again at final.
If the work calls for a permit, GVD files it with the Town of Loomis or Placer County and coordinates each inspection, so you are not tracking it yourself.
Knowing the order helps a homeowner read progress accurately, since the middle of a bathroom project looks alarmingly unfinished for a long stretch.
Each step protects the one after it. Close the walls before inspection and you may be reopening them; paint before tile and you will likely paint twice.
Expect 2 to 8 weeks. A focused update finishes fastest because nothing has to be moved, inspected, and re-closed; a layout change takes longest for exactly that reason.
Permit review adds time at the front end, material backorders (especially custom tile or a cut-to-order slab) are the other usual delay, and old plumbing or dry rot found during demolition can add several days, which is what the contingency is for.
The diligence a project this size deserves is about an hour of work, spread across a license lookup and two or three in-home estimates.
Verify the license, then have two or three contractors see the room in person. The items that move a bathroom price, such as drain material, subfloor condition, and venting, can only be judged on site.
Look up the license number at cslb.ca.gov before signing. Confirm it is active, check for disciplinary actions, and ask for proof of liability and workers' compensation coverage, since an uninsured crew shifts injury liability onto the homeowner.
You can walk our Rocklin showroom on Five Star Blvd and put your hands on the tile, see full quartz slabs instead of a two-inch chip, and open cabinet drawers before you commit, which a national franchise brochure cannot give you. That matters on a Loomis home, where the median value sits at $958,000 and finish choices carry real weight. Our in-house team self-performs most of the demolition, rough-in, waterproofing, and tile, so one coordinated team stays accountable from the estimate through the final walkthrough rather than rotating out-of-area crews. Your project falls under either the Town of Loomis or Placer County, and when a permit is required, GVD handles the permitting process so the inspection path is managed for you.
Our A+ BBB rating reflects how jobs are run: a single project manager coordinating every trade, and one accountable team from quote to walkthrough.
Our showroom is at 6848 Five Star Blvd #6 in Rocklin, about 7 miles from Loomis (roughly a 10-minute drive).
Trusted by Thousands of Homeowners Across Northern California
We bring the same crews, materials, and workmanship to every community around Loomis.
Most GVD bathroom projects in Loomis fall into three tiers: a focused update at $18,000 to $30,000, a mid-range remodel at $30,000 to $55,000 (where most projects land), and a primary bath with a layout change from $55,000 to $100,000 and up. Whether the plumbing moves is the biggest price driver.
Most bathroom remodels take 2 to 8 weeks. Permit review, special-order tile or slab, and repairs found during demolition are the usual variables.
Not always. Like-for-like fixture swaps generally skip permitting, while relocated plumbing, new electrical circuits, and framing changes generally need one. GVD handles any required permits through the Town of Loomis or Placer County.
A conversion makes sense when only the tub is the issue. When the vanity, flooring, or layout also need work, doing the room at once is usually cheaper over time. GVD quotes both routes.
Budget 15 to 20 percent beyond the quoted scope for concealed conditions such as old cast-iron or galvanized drains and a damaged subfloor. On pre-1980 homes that reserve often gets used.
At our Rocklin showroom on Five Star Blvd. You can compare tile, slabs, vanities, and fixtures in person and lock in selections before construction starts.























