
Decks in Larkspur and nearby Corte Madera and Mill Valley, designed for cool, damp bayside conditions. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Larkspur homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
Homeowners in Larkspur hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Larkspur or Marin County when a permit applies, and build it under California license #989637 with full insurance. Recent site visits have ranged from Greenbrae to nearby Corte Madera and Mill Valley, and every design starts with a measurement of your grade and attachment point.
How fast the ground falls away from the house behind your deck sets the number and depth of footings, the height of the posts, and whether the framing carries lateral bracing. That single measurement often decides more of the quote than the decking you pick, and it also shapes the permit path with the City of Larkspur or Marin County. We measure grade and fall at the estimate and quote one fixed total against what the site actually requires.
Carpenters, not a rotating crew assigned the week of the build, handle the framing that everything else depends on.
On most Larkspur deck quotes the footings and the framing below the boards are the majority of the price, and that is the part you never see once the deck is finished. Homeowners tend to focus on the board material, which is the smaller and more visible share, so knowing where the money actually goes keeps the whole conversation grounded before you call.
Height above grade is the variable homeowners underestimate. It drives the footing depth, the structural support, the guardrail requirement, and the permit path all at once.
A budget near $5,000 covers a small ground-level pressure-treated deck under 100 square feet. Most projects are considerably larger than that.
Our main decking page walks through pricing in more detail.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The honest summary is that composite and PVC buy you out of a refinishing cycle, and wood buys you a surface neither of them quite reproduces.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
This is the place where general decking advice most often misleads. It is written around pressure-treated pine, and a redwood deck is a different proposition entirely.
In Larkspur's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.
The brands GVD installs overlap heavily on performance. Where they differ is color range, texture, railing systems, and hidden fastener design.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Decks range from a low freestanding platform to an engineered second-story structure, and the City of Larkspur or Marin County draws the permit line somewhere in that range based on attachment, height, and size.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
When a permit is required, we draw the plans, submit them to the City of Larkspur or Marin County, and schedule each inspection ourselves.
Guardrails, stair geometry, and baluster spacing are the code items a homeowner is most likely to notice, and the framing items are the ones that matter more.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Height above grade changes the guardrail requirement, the footing depth, the post sizing, and the number of inspection stages, all at once.
Lots in and around Greenbrae and Larkspur Marina range from level to steeply sloped, and the difference shows up in the framing rather than in the decking.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
A deck cannot be compressed by working out of sequence. The open-framing inspection in particular has no substitute.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
A typical deck replacement runs one to three weeks on site. Where a specific project lands depends more on the structure below than on the square footage above.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
The question that matters most comes three years after the build: if a board cups or a railing connection loosens, who returns to look at it. A licensed contractor based here answers that call and stands behind the work, where a national franchise routes it through rotating out-of-area crews with no one accountable for the original attachment details. When a permit is required, GVD handles the permitting process with the City of Larkspur or Marin County, so the footing and ledger details clear inspection the first time. The build itself runs through one accountable GVD team from quote to walkthrough, which means the people who set your footings are the people who back the connection later. On homes valued around $2.19 million that continuity is what protects the structure over time.
We have worked through plan review with the City of Larkspur or Marin County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Larkspur.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Larkspur or Marin County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















