
A new North Bay deck with materials chosen for your specific site: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving San Rafael and San Anselmo.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical North Bay deck project with GVD, before your own site is measured.
Homeowners in North Bay hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through Marin County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby San Rafael, San Anselmo, and Larkspur, and every design starts with a measurement of your grade and attachment point.
A deck is a structural frame that happens to wear a finish product, and the parts that decide how long it stands are the ones you stop seeing once the boards go down. The ledger connection to the house and the footings carry the load, while the decking on top is the surface you notice. GVD inspects both the ledger location and the footing conditions at the estimate, because those two elements set the lifespan long before anyone chooses a board.
Deck projects fail at the connections more often than at the surface. GVD builds the ledger and footing details to specification on the first pass rather than fixing them at reinspection.
Framing, footings, and railing make up a base cost that stays fairly consistent from deck to deck because the structure has to meet the same load requirements regardless of finish. The decking material is what moves the number between two quotes, so knowing which cost lives in the structure and which lives in the surface tells you what you are actually comparing.
Height above grade is the variable homeowners underestimate. It drives the footing depth, the structural support, the guardrail requirement, and the permit path all at once.
For scale at the low end: a ground-level pressure-treated deck under 100 square feet runs near $5,000, which is the smallest project worth mobilizing a crew for.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
Decking materials diverge most on the elevations that get the hardest sun and the least airflow, which is where an unmaintained wood surface degrades first.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Homeowners often arrive expecting to pay a premium for composite. Against redwood that premium runs the other way, which usually simplifies the decision considerably.
Because the climate varies so much across this region, we choose materials for the lot rather than the zip code: lighter, heat-conscious colors where the sun is strong, and capped composite or PVC where a deck stays damp.
Every line here has a track record long enough to judge. The question is which color and texture you want to look at for twenty-five years.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Homeowners should expect any attached or elevated deck to be reviewed by Marin County, and should treat a proposal to skip that step as a warning rather than a saving.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
When a permit is required, we draw the plans, submit them to Marin County, and schedule each inspection ourselves.
What separates a well-built deck from a merely finished one is entirely in the details code exists to check.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
The steeper the grade, the more of the budget sits underneath the deck rather than on its surface.
How fast the ground falls away from the house sets the footing depth, the post sizing, and the guardrail requirement, so the site survey comes before the design.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
A deck cannot be compressed by working out of sequence. The open-framing inspection in particular has no substitute.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
One to three weeks covers most deck replacements, separate from the plan check queue that precedes them.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
A light routine keeps a composite deck looking close to new for a long time, and skipping it entirely is what makes people think the material failed.
Our in-house carpenters, who self-perform most of the work, build the deck from the framing through the final walkthrough, rather than rotating out-of-area crews who assemble a structure and leave before anyone checks it. That continuity matters most at the connections that carry load, the ledger attachment and the footings, because the person who set them is the same person answering for them at walkthrough. When a permit is required for your deck, GVD handles the permitting process with Marin County and builds to what plan review expects at framing inspection. You can also see and handle decking and railing options in our showroom before you commit, so the material driving your quote is a choice you have touched rather than a line you approved on paper.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around North Bay.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through Marin County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















