
A new South San Francisco deck with airflow and board choices suited to marine damp: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Millbrae and San Bruno.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical South San Francisco deck project with GVD, before your own site is measured.
GVD Renovations designs, permits, and builds decks in South San Francisco, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the City of South San Francisco or San Mateo County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Millbrae, San Bruno, and Burlingame, and every design starts with a measurement of your grade and attachment point.
How you plan to use the deck decides its size before the house does: a dining table for six, a lounge zone, and a route to the yard each set different footprints. That intended use drives whether you need one stair run or two, how wide the treads should be, and where the railing has to guard a drop. We start the design from how you will move across and around the deck, then size the framing to carry it.
GVD runs decks the same way it runs its siding and window work: one dedicated project manager per job, its own carpenters, and a fixed-price scope agreed before construction starts.
Footings and framing usually make up the majority of a deck quote, because that structure is what holds people, furniture, and the deck's own weight over time. Homeowners tend to focus on the board they will see and walk on, so knowing that the money largely sits below that surface keeps the budget conversation grounded before you call.
Height above grade is the variable homeowners underestimate. It drives the footing depth, the structural support, the guardrail requirement, and the permit path all at once.
| Deck | Typical cost | What sets it apart |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | Low upkeep, the usual choice |
| Redwood | $25,000–$35,000 | Premium wood, more upkeep |
| Full PVC or stone surface | $30,000–$45,000 | Best moisture and stain resistance |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Structure and engineering drive cost |
Below the tiers above, a small pressure-treated ground-level deck under 100 square feet sits near $5,000. It is a genuine option on a tight budget and a modest one.
For the full pricing breakdown, see our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The honest summary is that composite and PVC buy you out of a refinishing cycle, and wood buys you a surface neither of them quite reproduces.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
If the reason for considering wood is budget, the pricing above suggests reconsidering, since composite comes in below it and needs no refinishing cycle.
In South San Francisco's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Homeowners should expect any attached or elevated deck to be reviewed by the City of South San Francisco or San Mateo County, and should treat a proposal to skip that step as a warning rather than a saving.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
When a permit is required, we draw the plans, submit them to the City of South San Francisco or San Mateo County, and schedule each inspection ourselves.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Elevated construction is routine work, but it is not the same work, and a quote that prices it like a ground-level deck has missed something.
In Avalon Park and Brentwood, the deciding factor is how fast the ground falls away from the house, and that is measured on site rather than assumed.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
Nothing in this order is a scheduling preference. Footings gate framing, framing gates decking, and inspections sit between them.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
The build itself is one to three weeks for a typical replacement, which is short enough that the permit stage is often the longer half of the project.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Composite and PVC need far less upkeep than wood, but neither is maintenance-free, and dirt left in the board texture will dull a surface over time.
We carry more than one decking line, so the board we recommend follows your project and your budget rather than whatever a single supplier stocks. That means the framing plan, the span, and the footing count get sized to the material you actually choose, not the other way around. Our in-house crews, who self-perform most of the work, build the deck as one accountable team from quote to walkthrough, so the person who measured your ledger location is connected to the person who sets your footings. Deck framing and railing details in South San Francisco go through the City of South San Francisco or San Mateo County depending on where the property sits, and when a permit is required, GVD handles the permitting process and the inspection path that comes with it.
Our deck submittals are prepared for what the City of South San Francisco or San Mateo County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
We bring the same crews, materials, and workmanship to every community around South San Francisco.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of South San Francisco or San Mateo County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















