
Decks in San Bruno and nearby Burlingame and South San Francisco, with airflow and board choices suited to marine damp. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical San Bruno deck project with GVD, before your own site is measured.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through the City of San Bruno or San Mateo County, and construction in San Bruno. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby Burlingame, South San Francisco, and San Carlos, and every design starts with a measurement of your grade and attachment point.
How fast the ground drops away from your house behind the deck line sets the post heights, the footing count, and the framing that ties it all together, and none of that shows in a picture of the finished boards. On a flat lot the structure below can be modest, while a lot that falls away quickly can carry tall posts and lateral bracing that dominate the build. That grade also drives the permit path with the City of San Bruno or San Mateo County, so we measure the drop at the estimate before quoting anything.
The work is managed in-house end to end, which is what keeps the schedule and the inspection sequence under our control rather than a supplier's.
A deck budget is really two budgets: the structure underneath, which is set by the site, and the surface on top, which is set by taste.
For scale at the low end: a ground-level pressure-treated deck under 100 square feet runs near $5,000, which is the smallest project worth mobilizing a crew for.
The complete cost breakdown is on our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
This is the place where general decking advice most often misleads. It is written around pressure-treated pine, and a redwood deck is a different proposition entirely.
Damp, cool air shapes deck choices in San Bruno more than summer heat does. Decks that sit in shade or get little airflow underneath are the ones that show mildew, so we pay attention to ventilation under the frame and steer shaded areas toward capped composite or PVC rather than wood.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Most decks attached to the house, or built more than 30 inches above grade, require a building permit, because both conditions trigger structural and guardrail review. The City of San Bruno or San Mateo County applies that test to the specific project.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the City of San Bruno or San Mateo County as part of the job.
Deck code is mostly about connections. The ledger, the footings, and the guardrail are where inspections concentrate, because those are the failure points that matter.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
On a lot where the ground falls away from the house, the deck becomes a framed structure carrying real load rather than a platform sitting on the yard.
How fast the ground falls away from the house sets the footing depth, the post sizing, and the guardrail requirement, so the site survey comes before the design.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
The sequence from first conversation to final sign-off runs through six stages, each of which has to close before the next begins.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
The on-site portion runs one to three weeks for most projects, with footing curing and the inspection schedule setting the pace rather than the crew size.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
We have worked through plan review with the City of San Bruno or San Mateo County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around San Bruno.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of San Bruno or San Mateo County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















