
GVD designs and builds decks in Redwood City and nearby Belmont and San Carlos, designed for mild, sunny conditions. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Redwood City homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through the City of Redwood City or San Mateo County, and construction in Redwood City. We are licensed (#989637) and carry liability and workers' compensation coverage. Recent site visits have ranged from Emerald Hills and Farm Hill to nearby Belmont and San Carlos, and every design starts with a measurement of your grade and attachment point.
A deck is a structural project that happens to wear a finish product, and the boards you walk on are the smallest part of what keeps it standing. The ledger connection to the house and the footings under the frame decide how long the deck lasts and whether it stays level over years of use. GVD inspects both at the estimate, because neither shows in a photograph of finished decking.
Deck projects fail at the connections more often than at the surface. GVD builds the ledger and footing details to specification on the first pass rather than fixing them at reinspection.
Footings and framing are the majority of most deck quotes, and they sit entirely below the surface you actually see. Board selection is the choice homeowners focus on, so knowing that the structure underneath drives the real number keeps the budget conversation grounded before you call.
Most of a deck quote is framing, footings, and labor. The decking itself is the part homeowners think about and often not the largest line.
As a floor reference, a ground-level pressure-treated deck under 100 square feet comes in near $5,000, well below the standard replacement tiers above.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
Wood, composite, and PVC are three genuinely different products rather than three price points for the same thing, and they fail in different ways.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.
Redwood City's summers are sunny and dry but rarely extreme, so UV exposure matters more than heat. Unprotected redwood grays and checks faster in strong sun, and very dark composite still runs warmer underfoot in the afternoon, so a mid-tone board is a sensible default for an open, south- or west-facing deck.
There is no categorical quality gap between the major composite lines. There is a real gap between composite and PVC, and it shows up in the price.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until the City of Redwood City or San Mateo County confirms otherwise, since retroactive permitting costs more than filing at the outset.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
When a permit is required, we draw the plans, submit them to the City of Redwood City or San Mateo County, and schedule each inspection ourselves.
Guardrails, stair geometry, and baluster spacing are the code items a homeowner is most likely to notice, and the framing items are the ones that matter more.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
An elevated deck is a different structural problem from a ground-level one, not a taller version of the same project.
A deck around Emerald Hills and Farm Hill gets scoped against the actual grade at the back of the house, since that sets the footing depth and the guardrail requirement.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
Construction generally runs one to three weeks. The part that varies most is what comes before it, since plan check queues move at their own pace.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Composite and PVC need far less upkeep than wood, but neither is maintenance-free, and dirt left in the board texture will dull a surface over time.
On a deck the structural scope is set by the site, so a firm total price in a detailed digital proposal protects you against the cost creep that happens when framing conditions get discovered mid-build. GVD measures height above grade, checks the ledger location, and quotes the full scope and one fixed price, so the number you approve is the number you pay with no surprise charges once the crew is on site. Our in-house crews, who self-perform most of the work, build the frame and lay the boards as one accountable team from quote to walkthrough. When a permit is required, GVD handles the permitting process with the City of Redwood City or San Mateo County, and in Emerald Hills or Farm Hill an HOA or architectural review step can apply on top of the building permit.
Our deck submittals are prepared for what the City of Redwood City or San Mateo County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
We bring the same crews, materials, and workmanship to every community around Redwood City.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Redwood City or San Mateo County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















