
A new Apple Hill deck built for heavy snow and a short building season: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Placerville and Shingle Springs.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Apple Hill homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through El Dorado County, and construction in Apple Hill. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby Placerville, Shingle Springs, and Diamond Springs, and every design starts with a measurement of your grade and attachment point.
The point where a deck attaches to the house, the ledger, is the connection that lets water into a wall cavity when it is flashed carelessly, and the damage stays hidden behind siding until it is expensive. Flashing that joint correctly the first time means integrating the ledger with the house's water barrier so runoff sheds outward instead of tracking behind it. We inspect the ledger location and the wall behind it at the estimate, before any board is ordered.
The estimate is where a deck project is decided, because that is when somebody either does or does not work out what the grade, the ledger location, and the footing depth are going to require.
Framing, footings, and railing form the structural base of a deck and carry a fixed cost that changes little from quote to quote, while the decking material you choose drives most of the spread between one bid and another. Knowing which part of the price is structure and which is surface before you call keeps every later comparison honest.
Getting the structural scope right at the estimate is what makes a fixed price possible, since the largest unknowns on a deck are below the decking.
Composite deck replacement, standard size, $17,000 to $30,000. The most common GVD deck: composite boards and railing on treated framing, with no staining or sealing to schedule afterward.
Wood deck replacement, redwood, $25,000 to $35,000. Redwood decking and railing on treated framing. A premium material rather than a budget one, which is why it sits above composite here, and it needs refinishing on a regular cycle.
Premium PVC or stone-surface deck, $30,000 to $45,000. AZEK-type full-PVC decking, or stone or tile set over a waterproofed substrate, for owners who want the strongest moisture and stain resistance.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Multi-level framing, a covered structure, integrated lighting or benches, or a waterproofed deck over living space. Engineering and structural work drive this tier more than the decking surface does.
As a floor reference, a ground-level pressure-treated deck under 100 square feet comes in near $5,000, well below the standard replacement tiers above.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
Material choice on a deck is a maintenance-commitment decision. Homeowners who will not refinish on a cycle should not specify wood, whatever the price.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
This is the place where general decking advice most often misleads. It is written around pressure-treated pine, and a redwood deck is a different proposition entirely.
At Apple Hill's elevation, snow and freeze-thaw cycles set the design. Deck framing in heavy-snow areas is sized for the local design snow load rather than a standard live load, stairs and landings need to shed water and ice, and many composite manufacturers recommend a plastic shovel for clearing snow. High-altitude UV is also hard on unprotected wood.
A homeowner choosing between decking brands is usually really choosing between capped composite and full PVC, which is a construction decision rather than a badge.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until El Dorado County confirms otherwise, since retroactive permitting costs more than filing at the outset.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
GVD prepares the plans, submits for plan check, and schedules the inspections with El Dorado County when a permit applies, so you are not tracking down a separate expediter.
The code requirements below are worth understanding because they explain most of the framing cost and all of the inspection schedule.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Apple Hill is in wildfire country. Where a property falls inside a designated Wildland-Urban Interface area, California applies additional requirements to exterior construction, and decking materials and the deck-to-house connection can both be affected. Not every product qualifies, so the material list for a WUI lot is confirmed against current code and the manufacturer's listings before anything is ordered.
Elevated decks concentrate their cost below the decking, in footings and posts, which is why two decks of identical square footage can price very differently.
Local lots range from level to steeply sloped, and the difference shows up in the framing and footings rather than in the decking surface.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
Six stages, in a fixed order, with the homeowner's decisions concentrated in the first two.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Most residential deck replacements finish in one to three weeks of on-site work once permits clear.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
The realistic maintenance expectation for composite is cleaning rather than refinishing, which is a meaningful difference over a decade but not the same as nothing.
You can walk into our Rocklin showroom on Five Star Blvd and see full-size deck boards, railing systems, and finish colors laid out in person, rather than judging a color from a two-inch sample chip that reads differently at full scale and in real light. That matters most on the decking choice, since that is where the quotes diverge. The deck itself is built by one accountable GVD team from quote to walkthrough, so the person who measured your ledger is accountable for how it gets flashed. Deck permits in Apple Hill run through El Dorado County, and when a permit is required, GVD handles the permitting process and the inspection sequence that follows.
Having taken decks through El Dorado County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Apple Hill.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through El Dorado County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















