
A new Pollock Pines deck built for heavy snow and a short building season: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Apple Hill and Placerville.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
GVD Renovations designs, permits, and builds decks in Pollock Pines, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by El Dorado County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Apple Hill, Placerville, and Shingle Springs, and every design starts with a measurement of your grade and attachment point.
The first decision behind any deck is whether you want to sand and reseal wood on a repeating schedule or step off that cycle entirely with a composite or capped board that skips the refinishing. That choice sets the material, and the material is the biggest variable in what your deck costs and how you spend weekends after it is built. We walk through both paths at the estimate so you are choosing the maintenance commitment on purpose, not discovering it later.
We commit to a firm total price before work starts, which is possible because the structural scope gets settled at the estimate rather than discovered during framing.
Framing, footings, and railing carry a fixed base cost that changes little with your finish selection, so those numbers stay steady once we see the site. The decking material is what separates one quote from another, which is why knowing that split before you call keeps every later conversation grounded.
What a deck costs is decided largely before any material is chosen, by the shape of the lot and where the deck meets the house.
| Deck type | Typical range | Notes |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | No staining or sealing; our most-built deck |
| Redwood | $25,000–$35,000 | Real wood look, periodic refinishing |
| Full PVC or stone surface | $30,000–$45,000 | Best moisture and stain resistance |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Structure and engineering drive cost |
A budget near $5,000 covers a small ground-level pressure-treated deck under 100 square feet. Most projects are considerably larger than that.
The complete cost breakdown is on our main decking page.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.
At Pollock Pines's elevation, snow and freeze-thaw cycles set the design. Deck framing in heavy-snow areas is sized for the local design snow load rather than a standard live load, stairs and landings need to shed water and ice, and many composite manufacturers recommend a plastic shovel for clearing snow. High-altitude UV is also hard on unprotected wood.
Brand matters less on decking than most marketing suggests, and construction type matters more.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until El Dorado County confirms otherwise, since retroactive permitting costs more than filing at the outset.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with El Dorado County as part of the job.
The code requirements below are worth understanding because they explain most of the framing cost and all of the inspection schedule.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Pollock Pines is in wildfire country. Where a property falls inside a designated Wildland-Urban Interface area, California applies additional requirements to exterior construction, and decking materials and the deck-to-house connection can both be affected. Not every product qualifies, so the material list for a WUI lot is confirmed against current code and the manufacturer's listings before anything is ordered.
A second-story deck adds an engineering dimension to the project: the ledger has to carry more, and the footings have to go deeper.
The structural half of a deck quote is the half that varies most between properties, because it follows the site rather than the plan.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
A typical deck replacement runs one to three weeks on site. Where a specific project lands depends more on the structure below than on the square footage above.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Composite is often sold as maintenance-free. Refinishing-free is the accurate version, and it is still the main reason homeowners choose it.
We carry several decking lines rather than a single stocked product, so the board we recommend follows what your project needs instead of what a franchise happens to sell. A wood deck and a capped composite deck ask for different fastening and different maintenance, and having both on the table means the fit drives the pick. Our in-house crews, who self-perform most of the work, build the deck as one accountable team from quote to walkthrough, so the person who measured the ledger and footings is connected to the crew that frames them. Permitting in Pollock Pines runs through El Dorado County, and when a permit is required, GVD handles the permitting process, including the footing and framing details inspectors review before the deck is closed in.
We have worked through plan review with El Dorado County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around Pollock Pines.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with El Dorado County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















