
Decks in El Dorado Hills and nearby Cameron Park and Rescue, with WUI-aware material choices for foothill lots. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most El Dorado Hills homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
Homeowners in El Dorado Hills hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through El Dorado County when a permit applies, and build it under California license #989637 with full insurance. Recent site visits have ranged from Serrano and Promontory to nearby Cameron Park and Rescue, and every design starts with a measurement of your grade and attachment point.
Two deck quotes only compare when they assume the same footprint, the same height above grade, and the same way the deck attaches to the house. Change any one of those and the framing, footing count, and permit path change with it, so a lower number can simply describe a smaller or lower structure. We fix all three assumptions in writing at the estimate, then quote one firm total against them.
GVD carries several decking lines rather than one, so the recommendation is not constrained by what happens to be in stock.
Framing, footings, and railing carry a base cost that moves mainly with the deck's size and height above grade, while the decking material you choose drives most of the gap between one quote and another. Knowing which part is structure and which part is surface before you call lets you compare bids on the same footing rather than on the finish alone.
What a deck costs is decided largely before any material is chosen, by the shape of the lot and where the deck meets the house.
A $5,000 budget buys a small ground-level pressure-treated deck under 100 square feet, which is worth stating so the tiers above have a lower bound to read against.
The complete cost breakdown is on our main decking page.
Every decking material trades something. Wood trades maintenance for a natural surface, composite trades a premium for a fixed cap, PVC trades more premium for maximum resistance.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Note the cost order, because it is the reverse of the usual assumption: redwood sits above standard composite here. The wood option is a premium material rather than a budget one, so the composite decision is not about paying more now to save later.
El Dorado Hills's foothill climate brings hot, dry summers and wide day-to-night temperature swings. Composite and PVC boards expand and contract with that cycling, so we follow each manufacturer's gapping and fastening specifications closely, and lighter colors stay more comfortable underfoot in the afternoon sun.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Any deck that connects to the house, or that will need a guardrail, should be checked against El Dorado County's current requirements before construction is scheduled.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
GVD prepares the plans, submits for plan check, and schedules the inspections with El Dorado County when a permit applies, so you are not tracking down a separate expediter.
The code requirements below are worth understanding because they explain most of the framing cost and all of the inspection schedule.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
El Dorado Hills is in wildfire country. Where a property falls inside a designated Wildland-Urban Interface area, California applies additional requirements to exterior construction, and decking materials and the deck-to-house connection can both be affected. Not every product qualifies, so the material list for a WUI lot is confirmed against current code and the manufacturer's listings before anything is ordered.
Height above grade changes the guardrail requirement, the footing depth, the post sizing, and the number of inspection stages, all at once.
Around Serrano and Blackstone, the site survey does more to set a deck budget than the material selection does.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Crews are typically on a deck replacement for one to three weeks. Permit review and material lead time both sit outside that window.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
The routine below takes very little time and is the difference between a deck that looks its age and one that does not.
We carry several decking lines rather than a single stocked product, so the board we recommend follows what your deck actually needs rather than what we happen to have on hand. That matters most on a home like those in Serrano or Promontory, where architectural review can weigh in on materials and color before a board is ever ordered. Our in-house crews, who self-perform most of the work, build the frame, set the footings, and finish the railing as one coordinated team, so the person who measured your height above grade is accountable through the final walkthrough. Permitting here runs through El Dorado County, and when a permit is required, GVD handles that process and knows which footing and ledger details the county reviews before framing inspection.
Having taken decks through El Dorado County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around El Dorado Hills.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through El Dorado County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















