
GVD designs and builds decks in Cameron Park and nearby El Dorado Hills and Rescue, designed for hot days, cool nights, and sloped lots. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Cameron Park deck project with GVD, before your own site is measured.
GVD Renovations designs, permits, and builds decks in Cameron Park, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by El Dorado County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby El Dorado Hills, Rescue, and Pilot Hill, and every design starts with a measurement of your grade and attachment point.
How fast the ground falls away from your house decides the deck's structure before any board is chosen, because a drop of a few feet changes footing depth, post length, and lateral bracing all at once. That same grade sets the permit path with El Dorado County and drives most of the framing cost. GVD measures the fall across the footprint at the estimate, then quotes one fixed total against what the terrain actually requires.
A deck touches the house at the ledger, and that connection is where water gets into a wall if it is detailed carelessly. It is the part of the job worth asking a contractor about.
Height above grade is the single measurement that sets footing depth, the structural support underneath, whether a guardrail is required, and the permit path with El Dorado County, all at the same time, which is why a taller deck moves the number far more than square footage alone. Knowing that bracket before you call keeps the whole conversation grounded in your actual site.
Most of a deck quote is framing, footings, and labor. The decking itself is the part homeowners think about and often not the largest line.
Composite deck replacement, standard size, $17,000 to $30,000. Capped composite boards from Trex, TimberTech, or DuraLife over pressure-treated framing, finished with composite railing. The build we do most often.
Wood deck replacement, redwood, $25,000 to $35,000. Redwood decking and railing on treated framing. A premium material rather than a budget one, which is why it sits above composite here, and it needs refinishing on a regular cycle.
Premium PVC or stone-surface deck, $30,000 to $45,000. No wood content at all: full-PVC boards, or a stone or tile surface on a waterproofed base. The top performer against moisture and stains.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Multi-level decks, covered porches, built-in lighting or seating, and waterproofed decks over living space. Structure and engineering set the price here more than the boards do.
If the budget is the binding constraint, the entry point is around $5,000 for a small ground-level pressure-treated deck under 100 square feet.
The complete cost breakdown is on our main decking page.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
The honest summary is that composite and PVC buy you out of a refinishing cycle, and wood buys you a surface neither of them quite reproduces.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
The familiar framing, cheap wood versus expensive composite, does not describe these tiers. Redwood is the more expensive surface and it still needs refinishing, which makes composite the straightforward choice for most homeowners here.
Hot afternoons and cool nights mean decking in Cameron Park moves through a real temperature cycle every day in summer. Proper end- and side-gapping per the manufacturer's instructions keeps boards from buckling or opening up, and board color affects how hot the surface gets in direct sun.
Comparing brands is most useful once the construction type is settled, because within a type the lines are closer to each other than the marketing implies.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
The permit question mostly comes down to three facts: is it attached, how high is it, and is it larger than 200 square feet. El Dorado County applies both, and the decking material chosen does not affect the answer.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
GVD prepares the plans, submits for plan check, and schedules the inspections with El Dorado County when a permit applies, so you are not tracking down a separate expediter.
Passing inspection is not the goal in itself, but the things inspectors check are a reasonable list of the things that cause decks to fail.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
Cameron Park is in wildfire country. Where a property falls inside a designated Wildland-Urban Interface area, California applies additional requirements to exterior construction, and decking materials and the deck-to-house connection can both be affected. Not every product qualifies, so the material list for a WUI lot is confirmed against current code and the manufacturer's listings before anything is ordered.
Designing an elevated deck starts with the footing layout and works upward, which is the reverse of how most homeowners imagine the process.
Lots in and around Cameron Park Lake area and Cameron Estates range from level to steeply sloped, and the difference shows up in the framing rather than in the decking.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
The order the work happens in is also the order the decisions get locked, which is why material selection sits early rather than late.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
The build itself is one to three weeks for a typical replacement, which is short enough that the permit stage is often the longer half of the project.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
A deck sits in full sun collecting dust, pollen, and whatever falls out of the trees above it, so some routine is required whatever the material.
Our in-house carpenters, who self-perform most of the work, take your deck from framing through the final walkthrough, so the person who sets the ledger attachment and the footing connections is accountable for how they perform, not a rotating out-of-area crew that leaves before those details are tested. Ledger flashing, post-to-beam connections, and lateral load hardware are the joints that decide whether a deck stays sound, and one coordinated team means no handoff where those get missed. When a permit is required, GVD handles the permitting process through El Dorado County, so plan review and inspection stay with the same people building the deck. You can also see the board and railing options in person at our showroom before you commit to a fixed price.
We bring the same crews, materials, and workmanship to every community around Cameron Park.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with El Dorado County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















