
GVD designs and builds decks in Woodland and nearby West Sacramento and Winters, built for long, hot summers and strong sun. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Woodland deck project with GVD, before your own site is measured.
GVD Renovations designs, permits, and builds decks in Woodland, from ground-level backyard platforms to raised decks off upper-floor doors. Where a permit is required, the work is reviewed and inspected by the City of Woodland or Yolo County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby West Sacramento, Winters, and Davis, and every design starts with a measurement of your grade and attachment point.
How fast the ground falls away from your house sets how tall the deck framing has to stand, and that height decides the footing depth, the number of posts, and the bulk of the structural cost. A deck that sits close to level ground and one that steps down a falling grade can look identical in a finished photo while costing very different amounts to build underneath. We measure the drop from the house to grade at the estimate, then quote one fixed total against what that height actually requires.
GVD runs decks the same way it runs its siding and window work: one dedicated project manager per job, its own carpenters, and a fixed-price scope agreed before construction starts.
The framing, footings, and railing carry a base cost that stays fairly stable once the grade and footprint are known, while the decking material is what separates a modest quote from a high one. Knowing which of those two you are actually pricing keeps every later conversation grounded before you call.
The useful question at the outset is not which board you want but what the grade and the attachment point are going to require underneath it.
Composite deck replacement, standard size, $17,000 to $30,000. The most common GVD deck: composite boards and railing on treated framing, with no staining or sealing to schedule afterward.
Wood deck replacement, redwood, $25,000 to $35,000. A natural redwood surface and railing on treated framing. It prices above standard composite and adds a refinishing cycle to your upkeep.
Premium PVC or stone-surface deck, $30,000 to $45,000. Full-PVC boards such as the AZEK line, or a stone or tile surface over a waterproofed substrate. The choice where maximum moisture and stain resistance matters.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Multi-level decks, covered porches, built-in lighting or seating, and waterproofed decks over living space. Structure and engineering set the price here more than the boards do.
If the budget is the binding constraint, the entry point is around $5,000 for a small ground-level pressure-treated deck under 100 square feet.
Our main decking page walks through pricing in more detail.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The honest summary is that composite and PVC buy you out of a refinishing cycle, and wood buys you a surface neither of them quite reproduces.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
This is the place where general decking advice most often misleads. It is written around pressure-treated pine, and a redwood deck is a different proposition entirely.
In Woodland's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Any deck that connects to the house, or that will need a guardrail, should be checked against the current requirements of the City of Woodland or Yolo County before construction is scheduled.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
When a permit is required, we draw the plans, submit them to the City of Woodland or Yolo County, and schedule each inspection ourselves.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
Designing an elevated deck starts with the footing layout and works upward, which is the reverse of how most homeowners imagine the process.
Whether a deck is a ground-level platform or an elevated structure is decided by the fall of the individual lot, which is measured on site rather than assumed from the area.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
Nothing in this order is a scheduling preference. Footings gate framing, framing gates decking, and inspections sit between them.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
The build itself is one to three weeks for a typical replacement, which is short enough that the permit stage is often the longer half of the project.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
A light routine keeps a composite deck looking close to new for a long time, and skipping it entirely is what makes people think the material failed.
At our Rocklin showroom on Five Star Blvd you can stand over full-size deck boards, put your hands on the railing systems, and see the colors at full scale instead of guessing from a two-inch sample chip. A board that reads warm on a chip can read very different across an entire deck, and the showroom lets you settle that before anything is ordered. Our in-house crews, who self-perform most of the work, build what you approve, so one accountable team runs the job from the first measurement to the final walkthrough. Deck framing in Woodland answers to the City of Woodland or Yolo County depending on where your property sits, and when a permit is required, we handle the permitting process with the correct authority and take the framing through inspection.
We have worked through plan review with the City of Woodland or Yolo County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around Woodland.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Woodland or Yolo County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















