
A new Dixon deck built for long, hot summers and strong sun: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Vacaville and El Macero.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
GVD Renovations designs, permits, and builds decks in Dixon, from ground-level backyard platforms to raised decks off upper-floor doors. Where a permit is required, the work is reviewed and inspected by the City of Dixon or Solano County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Vacaville, El Macero, and Davis, and every design starts with a measurement of your grade and attachment point.
Whether the deck is meant for a dining table with clearance to pull out chairs, a hot tub with its concentrated load, or a straight run of steps down to the yard changes the footprint before we ever look at the house. Those uses set the size, the number of stairs, and the railing runs, and each of those drives its own share of the framing and labor. We start the estimate by asking how you plan to use the space, then size the structure to match.
One coordinated team handles layout, footings, framing, decking, railing, and stairs. There is no second company to chase when an inspection flags a detail.
Two decks with the identical layout become two different projects the moment one sits on a flat lot and the other on a slope, because the sloped site needs taller posts, more footings, and different lateral bracing. Knowing that the site drives the structural cost, not the floor plan, keeps your budget expectations grounded before you call.
Scope on a deck is set by the site. Two identical layouts on a flat lot and a sloped one are different projects with different numbers.
A $5,000 budget buys a small ground-level pressure-treated deck under 100 square feet, which is worth stating so the tiers above have a lower bound to read against.
For the full pricing breakdown, see our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
Every decking material trades something. Wood trades maintenance for a natural surface, composite trades a premium for a fixed cap, PVC trades more premium for maximum resistance.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Because redwood prices above standard composite, there is no payback period to calculate. Composite is both the lower-cost build and the lower-maintenance one, and wood is chosen for the look rather than the budget.
In Dixon's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
Comparing brands is most useful once the construction type is settled, because within a type the lines are closer to each other than the marketing implies.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until the City of Dixon or Solano County confirms otherwise, since retroactive permitting costs more than filing at the outset.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
GVD prepares the plans, submits for plan check, and schedules the inspections with the City of Dixon or Solano County when a permit applies, so you are not tracking down a separate expediter.
The code requirements below are worth understanding because they explain most of the framing cost and all of the inspection schedule.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
On a lot where the ground falls away from the house, the deck becomes a framed structure carrying real load rather than a platform sitting on the yard.
Local lots are mostly level, though grade and deck height still vary from lot to lot, and the difference shows up in the framing and footings rather than in the decking surface.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
The middle of this sequence is where a project either stays on schedule or does not, because that is where the inspections fall.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
Crews are typically on a deck replacement for one to three weeks. Permit review and material lead time both sit outside that window.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
We carry more than one decking line, so the board we recommend follows what your project actually needs rather than what happens to be stocked. For a low deck close to grade versus a raised deck with long spans, the sensible material choice differs, and having options lets us match the deck to the use and the budget. Our in-house crews, who self-perform most of the work, build what we quote, so the person measuring your footings is part of the team framing them. When a permit is required, GVD handles the permitting process through the City of Dixon or Solano County, depending on where your parcel sits. Working here regularly, we know which structural details the reviewing authority looks for before framing inspection.
Our deck submittals are prepared for what the City of Dixon or Solano County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Dixon.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Dixon or Solano County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















