
Decks in Antelope and nearby North Highlands and McClellan, designed around summer heat and UV. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Antelope homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
GVD Renovations designs, permits, and builds decks in Antelope, from ground-level backyard platforms to raised decks off upper-floor doors. Where a permit is required, the work is reviewed and inspected by Sacramento County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby North Highlands, McClellan, and Elverta, and every design starts with a measurement of your grade and attachment point.
Two deck quotes only compare when they cover the same footprint, the same height above grade, and the same attachment assumption, because each of those three changes the framing and the number. A quote for a freestanding deck and a quote for one ledgered to the house are not the same job even at identical square footage. Before you weigh price against price, confirm all three companies quoted the same structure.
Our project managers are GVD staff, and the same one owns the job from the first measurement through final sign-off, including the inspections.
The only deck number worth comparing between companies is a firm total for a defined footprint that states the height above grade it assumes and whether the deck is ledgered or freestanding. When two bids assume different attachments or different heights, you are comparing two different builds, not two prices.
What a deck costs is decided largely before any material is chosen, by the shape of the lot and where the deck meets the house.
A $5,000 budget buys a small ground-level pressure-treated deck under 100 square feet, which is worth stating so the tiers above have a lower bound to read against.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
None of these three is wrong for every deck. What is wrong is choosing on upfront price without knowing what the upkeep commitment looks like.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Wood here means redwood, which is a premium natural material. Anyone comparing it against composite on the assumption that wood is cheaper is comparing against a product that is not on the list.
Summer sun is the stress to design for in Antelope. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Where the brands genuinely diverge is at the top of their ranges, and that is also where the price separation appears.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until Sacramento County confirms otherwise, since retroactive permitting costs more than filing at the outset.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with Sacramento County as part of the job.
The code requirements below are worth understanding because they explain most of the framing cost and all of the inspection schedule.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
An elevated deck is a different structural problem from a ground-level one, not a taller version of the same project.
The structural half of a deck quote is the half that varies most between properties, because it follows the site rather than the plan.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
Budget one to three weeks on site. Elevated and second-story builds run longer because of footing depth and the extra inspection stages.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
If a board cups or a railing connection loosens three years after the build, you want a name and a license you can reach, not a franchise office that has moved on. We are a licensed contractor working across Sacramento County, and the crew that built your deck is reachable through the same company that quoted it. When a permit is required, GVD handles the permitting process with Sacramento County, so the framing and connection details are documented and inspected rather than left to memory. Your deck is built by one accountable GVD team, so responsibility for the ledger, the footings, and the railing sits in one place from the estimate through the final walkthrough.
Having taken decks through Sacramento County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Antelope.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with Sacramento County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















