
A new Wilton deck built for long, hot summers and strong sun: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Gold River and Rancho Cordova.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Wilton deck project with GVD, before your own site is measured.
Homeowners in Wilton hire GVD Renovations for everything from simple ground-level decks to multi-level structures. We design the deck, take it through Sacramento County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby Gold River, Rancho Cordova, and Galt, and every design starts with a measurement of your grade and attachment point.
The framing inspection happens while the structure is open, before any decking hides the joists, ledger, and footings, and there is no way to recreate that view once the boards go down. That single checkpoint sets the build order, because the footings, ledger attachment, and framing connectors all have to pass with everything visible. GVD builds toward that inspection from the first cut, so what the inspector needs to see stays exposed until it clears.
Deck projects fail at the connections more often than at the surface. GVD builds the ledger and footing details to specification on the first pass rather than fixing them at reinspection.
Two decks drawn to the same layout cost different amounts when one sits on a flat lot and the other on a slope, because the sloped site changes footing depth, post height, and framing before a single board is chosen. Knowing that the ground under the deck drives the structural number keeps the conversation honest once we walk the site.
Knowing which tier your deck falls into before you call keeps the conversation grounded, because the tiers differ by structure rather than by finish.
Below the tiers above, a small pressure-treated ground-level deck under 100 square feet sits near $5,000. It is a genuine option on a tight budget and a modest one.
For the full pricing breakdown, see our main decking page.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
What separates these materials in service is how each one handles sustained UV exposure and repeated wetting, not how they look in a showroom.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
If the reason for considering wood is budget, the pricing above suggests reconsidering, since composite comes in below it and needs no refinishing cycle.
Summer sun is the stress to design for in Wilton. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Where the brands genuinely diverge is at the top of their ranges, and that is also where the price separation appears.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Guardrail height, stair geometry, and ledger attachment are all inspected where a permit applies, and Sacramento County determines whether your project reaches that threshold.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
GVD prepares the plans, submits for plan check, and schedules the inspections with Sacramento County when a permit applies, so you are not tracking down a separate expediter.
The parts of a deck an inspector cares most about are the parts a homeowner never sees once the boards go down.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
Where the drop is significant, stairs and landings become part of the structure rather than an accessory to it, and they carry their own code requirements.
Grade is the first thing assessed at the consultation, because it determines the structure, the code requirements, and most of the cost.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
The six stages below are the same on every deck job. What varies is how long permitting takes and what the grade requires at the footings.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
The build itself is one to three weeks for a typical replacement, which is short enough that the permit stage is often the longer half of the project.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Upkeep on a modern deck is closer to cleaning a patio than to maintaining a wood structure, which is the point of the material.
On a deck where the site sets the structural scope, a firm total price in a detailed digital proposal protects you from the moment footing depth or post height turns out to be more than a photo suggested. The number you approve is the number you pay, with no surprise charges once the crew is on site. That crew is part of our in-house team, one accountable group from the first measurement through the final walkthrough, so no one hands off the framing details that the inspection depends on. Permitting in Wilton runs through Sacramento County, and when a permit is required, GVD handles the permitting process and builds to what the county reviewer expects to see while the framing is still open. On homes at this area's values, that continuity is what keeps a structural project on plan.
Having taken decks through Sacramento County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Wilton.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through Sacramento County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















