
GVD designs and builds decks in Florin and nearby La Riviera and Natomas, with heat-conscious board colors for full-sun decks. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
GVD Renovations designs, permits, and builds decks in Florin, from ground-level backyard platforms to raised decks off upper-floor doors. Where a permit is required, the work is reviewed and inspected by Sacramento County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby La Riviera, Natomas, and Rosemont, and every design starts with a measurement of your grade and attachment point.
The first material decision on a deck is whether you want to sand and reseal wood on a recurring cycle or move to a composite or PVC board that skips the refinishing schedule. Wood asks for periodic cleaning and resealing to hold its finish, while capped composite and PVC trade that upkeep for a higher board cost up front. We build both, so the choice comes down to how much ongoing maintenance you want to sign up for rather than what we happen to stock.
The work is managed in-house end to end, which is what keeps the schedule and the inspection sequence under our control rather than a supplier's.
Height above grade is the single dimension that moves a deck budget the most, because it sets footing depth, how much structural support the frame needs, whether a guardrail is required, and which permit path applies all at once. Knowing where your deck sits above grade before you call keeps the cost conversation anchored to your actual site.
The useful question at the outset is not which board you want but what the grade and the attachment point are going to require underneath it.
Composite deck replacement, standard size, $17,000 to $30,000. The most common GVD deck: composite boards and railing on treated framing, with no staining or sealing to schedule afterward.
Wood deck replacement, redwood, $25,000 to $35,000. A natural redwood surface and railing on treated framing. It prices above standard composite and adds a refinishing cycle to your upkeep.
Premium PVC or stone-surface deck, $30,000 to $45,000. No wood content at all: full-PVC boards, or a stone or tile surface on a waterproofed base. The top performer against moisture and stains.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Covered structures, multiple levels, integrated lighting or benches, or a deck that doubles as a roof over living space. Most of the cost sits in engineering and framing.
As a floor reference, a ground-level pressure-treated deck under 100 square feet comes in near $5,000, well below the standard replacement tiers above.
For the full pricing breakdown, see our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The material decision is about maintenance interval and service life more than about appearance, since all three options can be specified to look good on install day.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Because redwood prices above standard composite, there is no payback period to calculate. Composite is both the lower-cost build and the lower-maintenance one, and wood is chosen for the look rather than the budget.
In Florin's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
Every line here has a track record long enough to judge. The question is which color and texture you want to look at for twenty-five years.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Homeowners should expect any attached or elevated deck to be reviewed by Sacramento County, and should treat a proposal to skip that step as a warning rather than a saving.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with Sacramento County as part of the job.
Guardrails, stair geometry, and baluster spacing are the code items a homeowner is most likely to notice, and the framing items are the ones that matter more.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
Elevated construction is routine work, but it is not the same work, and a quote that prices it like a ground-level deck has missed something.
How fast the ground falls away from the house sets the footing depth, the post sizing, and the guardrail requirement, so the site survey comes before the design.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
Nothing in this order is a scheduling preference. Footings gate framing, framing gates decking, and inspections sit between them.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
Plan on one to three weeks of construction for most deck replacements, with permitting as a separate stage before crews mobilize.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
A light routine keeps a composite deck looking close to new for a long time, and skipping it entirely is what makes people think the material failed.
We carry several decking lines rather than a single house brand, so the board we recommend follows your project and your maintenance tolerance instead of whatever a franchise has in its warehouse. That matters most on the wood versus composite versus PVC decision, where the right answer depends on your site and your upkeep preference, not on our inventory. Our in-house crews, who self-perform most of the work, build the frame and lay the boards as one coordinated team, so the person who quotes the job answers for how it goes in. Because Sacramento County is the permit authority in Florin, we work through its plan review process when a permit is required, and we know which footing and ledger details its inspectors check before framing is closed up.
We bring the same crews, materials, and workmanship to every community around Florin.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through Sacramento County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















