
GVD designs and builds decks in Folsom and nearby Gold River and Rancho Cordova, designed around summer heat and UV. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Folsom deck project with GVD, before your own site is measured.
Homeowners in Folsom hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Folsom or Sacramento County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby Gold River, Rancho Cordova, and Rio Linda, and every design starts with a measurement of your grade and attachment point.
Once decking boards go down, the framing, joist hangers, and ledger attachment they cover cannot be inspected without pulling the surface back up, so the open-framing stage is the one look at the structure nobody can substitute for later. GVD sequences the build around that stage, confirming footings, ledger connection, and hanger fastening while the frame is still exposed and before any board is fastened over it. The finished deck you walk on rests on details that were verified when they could still be seen.
We are a licensed local contractor rather than a franchise routing your deck to rotating out-of-area crews, and the crew that shows up is the one we manage.
Framing, footings, and railing carry a fixed base cost that changes little from one deck to the next of the same footprint, while the decking material you choose is what actually separates one quote from another. Knowing which part of the number is structure and which part is surface tells you where a lower bid is really cutting.
Square footage sets the surface cost and the grade sets the structural cost, and on a sloped lot the second can exceed the first.
| Build | Installed range | Why choose it |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | Low upkeep, the usual choice |
| Redwood | $25,000–$35,000 | Premium wood, more upkeep |
| Full PVC or stone surface | $30,000–$45,000 | No wood fiber; toughest against damp |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Multi-level, covered, or over living space |
The smallest practical project, a ground-level pressure-treated deck under 100 square feet, sits near $5,000 and sets the low end of what is possible.
The complete cost breakdown is on our main decking page.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
The familiar framing, cheap wood versus expensive composite, does not describe these tiers. Redwood is the more expensive surface and it still needs refinishing, which makes composite the straightforward choice for most homeowners here.
Summer sun is the stress to design for in Folsom. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Ask to see full-size boards rather than samples. Color and texture read very differently at scale, and that is the decision you live with.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Most decks attached to the house, or built more than 30 inches above grade, require a building permit, because both conditions trigger structural and guardrail review. The City of Folsom or Sacramento County applies that test to the specific project.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the City of Folsom or Sacramento County as part of the job.
Deck framing is governed by the same structural provisions as any exterior structure, and the inspections follow the order the load path is built in.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Sloped lots are where deck projects diverge most from a standard quote, because the structure has to follow a grade that a flat-lot design assumes away.
Whether a deck is a ground-level platform or an elevated structure is decided by the fall of the individual lot, which is measured on site rather than assumed from the area.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
Six stages, in a fixed order, with the homeowner's decisions concentrated in the first two.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
Budget one to three weeks on site. Elevated and second-story builds run longer because of footing depth and the extra inspection stages.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
The maintenance case for composite is real and worth stating precisely: no sanding, no staining, no sealing. Cleaning still applies.
The question worth asking before you sign is who answers the phone in three years if a board cups or a railing connection loosens. A licensed contractor based in the Sacramento County area is reachable at the same license and stays accountable for the connection long after the crew has left, which is not something a national franchise routing work to rotating out-of-area crews can promise. When a permit is required for your deck, GVD handles the permitting process with the City of Folsom or Sacramento County, whichever has authority over your address. The framing, footings, and finish work are carried out by one accountable GVD team, so the people who set the ledger are the people accountable for how it holds up on a home in this price range, where the median value sits at $769,000.
Having taken decks through the City of Folsom or Sacramento County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Folsom.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Folsom or Sacramento County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















