
GVD designs and builds decks in Tiburon and nearby Albany and San Pablo, designed for cool, damp bayside conditions. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Tiburon homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through the Town of Tiburon or Marin County, and construction in Tiburon. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby Albany, San Pablo, and El Cerrito, and every design starts with a measurement of your grade and attachment point.
The first material decision on a new deck is which refinishing cycle you want to live with, because wood boards ask for periodic cleaning and resealing while composite and PVC boards trade that recurring work for a higher board cost up front. Choosing that cycle up front shapes both the board you buy and the maintenance calendar you keep for the life of the deck. GVD walks you through what each board class asks of you before we quote, so the number you approve reflects the upkeep you actually signed up for.
GVD runs decks the same way it runs its siding and window work: one dedicated project manager per job, its own carpenters, and a fixed-price scope agreed before construction starts.
Two decks with the identical layout and railing are different projects when one sits on a flat lot and the other steps down a slope, because the sloped site adds taller posts, more footings, and framing that carries the change in grade. Knowing that the site sets the structural cost, not the floor plan you sketch, keeps your first call grounded in what the ground under the deck will actually require.
Most of a deck quote is framing, footings, and labor. The decking itself is the part homeowners think about and often not the largest line.
| Deck | Typical cost | What sets it apart |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | No staining or sealing; our most-built deck |
| Redwood | $25,000–$35,000 | Natural grain; needs refinishing |
| Full PVC or stone surface | $30,000–$45,000 | Best moisture and stain resistance |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Multi-level, covered, or over living space |
A budget near $5,000 covers a small ground-level pressure-treated deck under 100 square feet. Most projects are considerably larger than that.
For the full pricing breakdown, see our main decking page.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
Every decking material trades something. Wood trades maintenance for a natural surface, composite trades a premium for a fixed cap, PVC trades more premium for maximum resistance.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Wood here means redwood, which is a premium natural material. Anyone comparing it against composite on the assumption that wood is cheaper is comparing against a product that is not on the list.
In Tiburon's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.
Treating all composite as one product is the mistake. Capped and uncapped, wood-core and full PVC, are meaningfully different things sold under overlapping names.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until the Town of Tiburon or Marin County confirms otherwise, since retroactive permitting costs more than filing at the outset.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the Town of Tiburon or Marin County as part of the job.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
A second-story deck adds an engineering dimension to the project: the ledger has to carry more, and the footings have to go deeper.
Around Belveron and Lyford Cove, the site survey does more to set a deck budget than the material selection does.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
Nothing in this order is a scheduling preference. Footings gate framing, framing gates decking, and inspections sit between them.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
Plan on one to three weeks of construction for most deck replacements, with permitting as a separate stage before crews mobilize.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
Composite is often sold as maintenance-free. Refinishing-free is the accurate version, and it is still the main reason homeowners choose it.
Having taken decks through the Town of Tiburon or Marin County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Tiburon.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the Town of Tiburon or Marin County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















