
A new Palo Alto deck built for sunny, dry summers and UV: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Los Altos and Sunnyvale.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Palo Alto deck project with GVD, before your own site is measured.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through the City of Palo Alto or Santa Clara County, and construction in Palo Alto. We are licensed (#989637) and carry liability and workers' compensation coverage. Recent site visits have ranged from Crescent Park and Professorville to nearby Los Altos and Sunnyvale, and every design starts with a measurement of your grade and attachment point.
Whether a deck attaches to your house and how high it sits above grade are the two facts that most often decide whether the project needs a permit through the City of Palo Alto or Santa Clara County. Neither is something you can settle over the phone, because both depend on measurements taken at the structure. GVD establishes the attachment method and the height above grade at the estimate, then works from what those measurements show.
The work is managed in-house end to end, which is what keeps the schedule and the inspection sequence under our control rather than a supplier's.
Footings and framing, everything below the boards you walk on, make up the majority of most deck quotes, while the decking material is the part homeowners spend the most time choosing. Knowing that the structure carries the bulk of the cost before you call keeps the board conversation in proportion to the whole budget.
Size and height above grade together explain most of the difference between two deck quotes for the same house.
The bottom of the market here is a ground-level pressure-treated deck under 100 square feet at around $5,000, and everything above it is a question of size, height, and material.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
The two questions worth separating are what a deck costs to build and what it costs to keep. Against redwood, composite answers both in the same direction.
Palo Alto's summers are sunny and dry but rarely extreme, so UV exposure matters more than heat. Unprotected redwood grays and checks faster in strong sun, and very dark composite still runs warmer underfoot in the afternoon, so a mid-tone board is a sensible default for an open, south- or west-facing deck.
Where the brands genuinely diverge is at the top of their ranges, and that is also where the price separation appears.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
The permit question mostly comes down to three facts: is it attached, how high is it, and is it larger than 200 square feet. The City of Palo Alto or Santa Clara County applies both, and the decking material chosen does not affect the answer.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
GVD prepares the plans, submits for plan check, and schedules the inspections with the City of Palo Alto or Santa Clara County when a permit applies, so you are not tracking down a separate expediter.
A deck that meets code at the ledger and the footings will outlast its decking surface. One that does not will not, whatever goes on top.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Inspections usually happen at the footing stage, again at framing and ledger attachment, and at final. Improperly lapped ledger flashing is one of the more common reasons a deck fails an inspection, so we flash it to the manufacturer's specification during framing.
The steeper the grade, the more of the budget sits underneath the deck rather than on its surface.
Lots around Crescent Park and Old Palo Alto vary enough in grade that two houses on the same street can need very different structures underneath the same size deck.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
The order the work happens in is also the order the decisions get locked, which is why material selection sits early rather than late.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
One to three weeks covers most deck replacements, separate from the plan check queue that precedes them.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
The routine below takes very little time and is the difference between a deck that looks its age and one that does not.
At our showroom on Five Star Blvd in Rocklin you can stand next to full-size decking boards, handle the railing systems, and compare colors under real light rather than judging a sample chip the size of a business card. Boards read differently at full length, and that is the version you live with in Crescent Park, Old Palo Alto, Professorville, or Barron Park. We build what you select, so one accountable team carries the project from the quote through the final walkthrough. We have taken deck plans through review in Santa Clara County before, so when a permit is required for your attachment and height, GVD handles the permitting process against the details local reviewers examine.
Our deck submittals are prepared for what the City of Palo Alto or Santa Clara County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
We bring the same crews, materials, and workmanship to every community around Palo Alto.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Palo Alto or Santa Clara County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















