
GVD designs and builds decks in Mountain View and nearby Cupertino and Santa Clara, with UV-stable boards for sunny yards. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Mountain View deck project with GVD, before your own site is measured.
GVD Renovations designs, permits, and builds decks in Mountain View, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the City of Mountain View or Santa Clara County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. Recent site visits have ranged from Cuesta Park and Whisman to nearby Cupertino and Santa Clara, and every design starts with a measurement of your grade and attachment point.
Whether a deck attaches to your house at a ledger or stands free on its own posts, and how far its surface sits above grade, are, along with size, the main facts that determine whether the City of Mountain View or Santa Clara County requires a permit for it. Neither is something you can settle from a sketch or a catalog photo. GVD measures the height above grade and confirms the attachment method at the estimate, so the permit path is established before we quote a firm total price in a detailed digital proposal.
We commit to a firm total price before work starts, which is possible because the structural scope gets settled at the estimate rather than discovered during framing.
Two decks with an identical layout, one on a flat lot and one on a sloped one, are different structural projects with different framing and footing costs. Knowing that the site itself moves the budget before you call keeps the conversation grounded in what your specific lot demands.
Knowing which tier your deck falls into before you call keeps the conversation grounded, because the tiers differ by structure rather than by finish.
The floor of the range is around $5,000 for a small ground-level pressure-treated deck under 100 square feet, useful mostly as a reference point for what the minimum looks like.
The complete cost breakdown is on our main decking page.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
A pressure-treated deck is genuinely the budget option and sits below all of these tiers. Redwood is not, and conflating the two is the most common mistake in a decking conversation.
In Mountain View's mild, sunny climate the stressor is UV rather than heat or damp. Capped composite and PVC hold their color better than unsealed wood, and a lighter board keeps the surface more comfortable on sunny afternoons.
The brands GVD installs overlap heavily on performance. Where they differ is color range, texture, railing systems, and hidden fastener design.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Whether a deck needs a permit turns on how it attaches and how high it sits. A low, freestanding platform sometimes falls outside the requirement; an attached or elevated deck typically does not. The City of Mountain View or Santa Clara County makes that call.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
When a permit is required, we draw the plans, submit them to the City of Mountain View or Santa Clara County, and schedule each inspection ourselves.
Inspections on a deck happen while the structure is open, which is the only time the connections can be verified at all.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
On a lot where the ground falls away from the house, the deck becomes a framed structure carrying real load rather than a platform sitting on the yard.
A deck around Old Mountain View and Cuesta Park gets scoped against the actual grade at the back of the house, since that sets the footing depth and the guardrail requirement.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
Each stage below either has to be inspected or has to be structurally complete before the next one starts, which is what sets the calendar.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
A typical deck replacement runs one to three weeks on site. Where a specific project lands depends more on the structure below than on the square footage above.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
The maintenance case for composite is real and worth stating precisely: no sanding, no staining, no sealing. Cleaning still applies.
We have taken deck plans through review with the City of Mountain View and Santa Clara County regularly, so we know which ledger attachment and footing details reviewers and inspectors examine before framing inspection. On homes in Old Mountain View, Cuesta Park, Whisman, and Monta Loma, that familiarity means the ledger connection and footing depth are detailed correctly the first time, and when a permit is required, GVD handles the permitting process. The deck is built by one accountable GVD team from the estimate through the final walkthrough, rather than rotating out-of-area crews who leave once the framing is up. Before any of that, you can see board materials, railing systems, and framing hardware in our showroom and decide on the details in person, against a fixed total price.
We have worked through plan review with the City of Mountain View or Santa Clara County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around Mountain View.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Mountain View or Santa Clara County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















