
GVD designs and builds decks in Stanford and nearby Mountain View and Santa Clara, with UV-stable boards for sunny yards. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through Santa Clara County, and construction in Stanford. We are licensed (#989637) and carry liability and workers' compensation coverage. We also build decks in nearby Mountain View, Santa Clara, and Saratoga, and every design starts with a measurement of your grade and attachment point.
The framing inspection happens while the connections are still open and visible, and once the decking goes down there is no way to inspect the ledger, joist hangers, and footings without tearing that decking back off. That sequence sets the entire build order, because the crew has to pass open-framing inspection before it can close anything up. GVD builds to that sequence deliberately, so the structural connections an inspector needs to see stay accessible until the moment they are signed off.
The estimate is where a deck project is decided, because that is when somebody either does or does not work out what the grade, the ledger location, and the footing depth are going to require.
Two decks with the same layout cost different amounts depending on what they stand on, because a flat lot and a sloped one call for different footings, post heights, and framing. Ask how the site itself changes the structural work before you call, so the number you hear later matches the ground you actually have.
What a deck costs is decided largely before any material is chosen, by the shape of the lot and where the deck meets the house.
At the very low end, a small ground-level pressure-treated deck under 100 square feet sits near $5,000, though that is the bottom of the range rather than a typical project.
For the full pricing breakdown, see our main decking page.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
Decking materials diverge most on the elevations that get the hardest sun and the least airflow, which is where an unmaintained wood surface degrades first.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Wood here means redwood, which is a premium natural material. Anyone comparing it against composite on the assumption that wood is cheaper is comparing against a product that is not on the list.
In Stanford's mild, sunny climate the stressor is UV rather than heat or damp. Capped composite and PVC hold their color better than unsealed wood, and a lighter board keeps the surface more comfortable on sunny afternoons.
Brand matters less on decking than most marketing suggests, and construction type matters more.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Homeowners should expect any attached or elevated deck to be reviewed by Santa Clara County, and should treat a proposal to skip that step as a warning rather than a saving.
A deck typically skips permitting only if it is freestanding, 200 square feet or smaller, no more than 30 inches above grade, and not the required exit from a door. Attach it to the house, build it larger, or build it higher, and it generally needs a permit and inspections.
When a permit is required, we draw the plans, submit them to Santa Clara County, and schedule each inspection ourselves.
The parts of a deck an inspector cares most about are the parts a homeowner never sees once the boards go down.
The framing rules cover the parts you will not see: footing depth and bearing, how the ledger attaches to the house rim joist, and joist spacing matched to the decking's rated span. Guardrails are required at 30 inches or more above grade, and stair geometry and baluster spacing are checked at final.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
The steeper the grade, the more of the budget sits underneath the deck rather than on its surface.
Level lots take straightforward footings and a simple permit path; sloping lots need engineered footings and more inspection stages.
Steep grades call for engineered footings poured to depth, a heavier-rated ledger connection, and code-height guardrails. The footing plan is drawn against the real slope of your lot, which is the detail that most often decides whether framing inspection passes the first time.
A deck cannot be compressed by working out of sequence. The open-framing inspection in particular has no substitute.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
One to three weeks covers most deck replacements, separate from the plan check queue that precedes them.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Upkeep on a modern deck is closer to cleaning a patio than to maintaining a wood structure, which is the point of the material.
Our in-house carpenters, who self-perform most of the work, run your project from framing through the final walkthrough, so the same people who set the footings and attach the ledger are the ones who answer for those connections at the end. That continuity matters most at the points you cannot see later: the ledger attachment, the hangers, and the footing depth. Rotating out-of-area crews break that chain, handing off the connections that carry the deck to whoever is available next. When a permit is required, GVD handles the permitting process with Santa Clara County, so the inspection steps are scheduled into the build rather than bolted on. You can also see framing hardware and decking options in our showroom before you commit to a material.
Having taken decks through Santa Clara County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Stanford.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with Santa Clara County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















