
GVD designs and builds decks in Citrus Heights and nearby Arden Arcade and Carmichael, designed around summer heat and UV. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Citrus Heights homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
Homeowners in Citrus Heights hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Citrus Heights or Sacramento County when a permit applies, and build it under California license #989637 with full insurance. Recent site visits have ranged from Sunrise Oaks and Stock Ranch to nearby Arden Arcade and Carmichael, and every design starts with a measurement of your grade and attachment point.
The first choice in a new deck is whether you want to sand, seal, and restain wood on a recurring cycle, or move to a composite or capped board that skips the refinishing schedule. That single decision drives the board material, the fastener system, and how the deck looks in five years, so it belongs at the front of the conversation, not after the framing is designed. We walk you through both paths at the estimate and quote one fixed total against the option you choose.
GVD carries several decking lines rather than one, so the recommendation is not constrained by what happens to be in stock.
Most of a deck quote sits below the boards you walk on, in the footings and framing that carry the load, while homeowners tend to focus on the decking surface they can see. Knowing that the structure is the larger share of the number before you call keeps the board-selection discussion in proportion to what it actually costs.
Getting the structural scope right at the estimate is what makes a fixed price possible, since the largest unknowns on a deck are below the decking.
A $5,000 budget buys a small ground-level pressure-treated deck under 100 square feet, which is worth stating so the tiers above have a lower bound to read against.
The complete cost breakdown is on our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
Wood, composite, and PVC are three genuinely different products rather than three price points for the same thing, and they fail in different ways.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Most decking advice assumes wood is the cheap option and composite the upgrade. That holds for pressure-treated pine and not for redwood, which is what sits in the wood tier above.
Summer sun is the stress to design for in Citrus Heights. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Comparing brands is most useful once the construction type is settled, because within a type the lines are closer to each other than the marketing implies.
GVD installs Trex (including the Transcend and Enhance lines), TimberTech (including its AZEK full-PVC line), and DuraLife. Between them, the practical differences are color and texture, railing and hidden-fastener systems, and where a line sits on price. The bigger decision is construction: capped composite has a wood-fiber core under a protective cap, while full PVC has no wood content at all, which makes it the strongest option against moisture and staining and puts it in a higher price tier.
Most decks attached to the house, or built more than 30 inches above grade, require a building permit, because both conditions trigger structural and guardrail review. The City of Citrus Heights or Sacramento County applies that test to the specific project.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the City of Citrus Heights or Sacramento County as part of the job.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
An elevated deck is a different structural problem from a ground-level one, not a taller version of the same project.
Lots around Sunrise Oaks and Stock Ranch vary enough in grade that two houses on the same street can need very different structures underneath the same size deck.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
Each stage below either has to be inspected or has to be structurally complete before the next one starts, which is what sets the calendar.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Budget one to three weeks on site. Elevated and second-story builds run longer because of footing depth and the extra inspection stages.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Most complaints about composite appearance after a few years trace to cleaning that never happened rather than to the board itself.
We take deck framing through plan review with the City of Citrus Heights and Sacramento County on a regular basis, so we know which ledger attachment and footing details reviewers and inspectors look at closely before they sign off. When a permit is required for your deck, GVD handles the permitting process and builds to the details that clear inspection the first time. Homes in Sunrise Oaks, Stock Ranch, and Arcade Creek are served by one accountable GVD team from the first measurement to the final walkthrough, rather than rotating out-of-area crews. You can also see and handle decking boards, railing, and fastener systems in our showroom before you commit, so the surface you choose is the surface you get.
We bring the same crews, materials, and workmanship to every community around Citrus Heights.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the City of Citrus Heights or Sacramento County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















