
A new Loomis deck built for long, hot summers and strong sun: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Penryn and Roseville.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Loomis homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
GVD Renovations designs, permits, and builds decks in Loomis, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the Town of Loomis or Placer County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Penryn, Roseville, and Sun City Roseville, and every design starts with a measurement of your grade and attachment point.
How quickly the ground falls away from your house sets the deck's structure before any board is chosen: a few feet of drop can mean deeper footings, taller posts, and additional lateral bracing. That drop also shapes the permit path, since a deck raised well above grade is reviewed differently than one close to the ground. GVD measures the height above grade and reads the slope at the estimate, then quotes one fixed total price against what the site actually requires.
The estimate is where a deck project is decided, because that is when somebody either does or does not work out what the grade, the ledger location, and the footing depth are going to require.
Two identical deck layouts, one on a flat lot and one on a lot that falls away from the house, are different structural projects with different framing and footing costs. Knowing that the site drives that difference, not the floor plan, keeps every cost conversation grounded before you call.
The attachment decision, freestanding or ledger-attached, changes the permit path and the framing at the same time, which is why it gets settled first.
Composite deck replacement, standard size, $17,000 to $30,000. Capped composite boards from Trex, TimberTech, or DuraLife over pressure-treated framing, finished with composite railing. The build we do most often.
Wood deck replacement, redwood, $25,000 to $35,000. A natural redwood surface and railing on treated framing. It prices above standard composite and adds a refinishing cycle to your upkeep.
Premium PVC or stone-surface deck, $30,000 to $45,000. No wood content at all: full-PVC boards, or a stone or tile surface on a waterproofed base. The top performer against moisture and stains.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Multi-level decks, covered porches, built-in lighting or seating, and waterproofed decks over living space. Structure and engineering set the price here more than the boards do.
The floor of the range is around $5,000 for a small ground-level pressure-treated deck under 100 square feet, useful mostly as a reference point for what the minimum looks like.
The complete cost breakdown is on our main decking page.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
Wood, composite, and PVC are three genuinely different products rather than three price points for the same thing, and they fail in different ways.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
This is the place where general decking advice most often misleads. It is written around pressure-treated pine, and a redwood deck is a different proposition entirely.
In Loomis's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
Brand matters less on decking than most marketing suggests, and construction type matters more.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Decks range from a low freestanding platform to an engineered second-story structure, and the Town of Loomis or Placer County draws the permit line somewhere in that range based on attachment, height, and size.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the Town of Loomis or Placer County as part of the job.
A deck is one of the few residential structures where a code failure has immediate consequences, which is why the inspection sequence is as prescriptive as it is.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
The steeper the grade, the more of the budget sits underneath the deck rather than on its surface.
Grade is the first thing assessed at the consultation, because it determines the structure, the code requirements, and most of the cost.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
Each stage below either has to be inspected or has to be structurally complete before the next one starts, which is what sets the calendar.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Expect one to three weeks of build time once approvals are in hand. A ground-level deck sits at the short end and an elevated build at the long end.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
Composite is often sold as maintenance-free. Refinishing-free is the accurate version, and it is still the main reason homeowners choose it.
Our Rocklin showroom on Five Star Blvd lets you stand over full-size decking boards, handle the actual railing systems, and compare colors under real light rather than judging from a sample chip, which is the difference between guessing a finish and choosing one. The deck is built by one accountable GVD team from the estimate through the final walkthrough, so the people who measured your slope are the people framing against it. Decks in Loomis fall under either the Town of Loomis or Placer County depending on where your parcel sits, and when a permit is required, GVD handles the permitting process with the correct authority. We work these two jurisdictions regularly, so we know which set of rules applies to your address.
We have worked through plan review with the Town of Loomis or Placer County and neighboring jurisdictions, so when a permit is required our submittals match what inspectors expect.
We bring the same crews, materials, and workmanship to every community around Loomis.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the Town of Loomis or Placer County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















