New or refaced kitchen cabinets in Alta Sierra — IKEA, semi-custom, or fully custom, set level and true by GVD's own crews, one written fixed price.
GVD measures, installs, and finishes your cabinets under one accountable team. Here is the shape of a typical Alta Sierra cabinet install.
Recent GVD kitchen and cabinet projects, prioritized nearest Alta Sierra.
Kitchen cabinet installation in Alta Sierra covers everything from a straight swap of stock boxes to a full custom layout with a waterfall island. The installer you hire determines whether that swap goes smoothly or turns into a change-order fight.
Cabinet installers price by the linear foot of run, not by the square footage of the room, so a large kitchen with a short galley run can cost less than a small kitchen wrapped on three walls. When you compare two quotes, check that both count the same linear feet across the same walls, including or excluding the island the same way. A number that looks lower often covers fewer feet, not cheaper work.
Cabinet work is bought two ways: from a retailer who sells you boxes and refers an installer, or from a contractor who does both. We do both, which is why there is nobody to hand you off to mid-job.
You get a full scope and one firm price in writing before the crew is scheduled. Routine prep like fillers and out-of-square corners is part of our scope, not a renegotiation. If we uncover concealed damage that changes the work, we document the added scope for your approval first.
Schedule a free in-home consultation: call (916) 269-0761.
What sits behind the old boxes is where an estimate becomes a different number: rot in the sink base, wiring that predates current code, and walls out of plumb enough to throw off a level cabinet run. Ask how each of those conditions is handled before the crew opens the wall, because those are the discoveries that move a budget once demolition starts.
Full cabinet installation, cabinets and labor, $8,000 to $30,000. The installed total for a standard kitchen. Where you land depends on kitchen size measured in linear feet, cabinet tier, and how much of the existing kitchen has to come out first. Cabinets typically carry 30 to 40% of a full kitchen budget, driven by both product cost and the labor to set them.
Fully custom cabinetry, $150 to $500 per linear foot. Built to the exact dimensions of the room rather than from standard sizes, often with premium European hardware and typically a 6 to 10 week manufacturing lead time. The tier to choose when the layout is unusual or the storage requirement is specific.
Installers price by linear footage rather than by the room. A small galley kitchen with 10 linear feet of cabinetry costs less to install than an L-shaped kitchen with an island, even when both use the same cabinet line. For the full pricing breakdown by scope, see our main kitchen cabinets page.
Cabinets alone, installed, typically account for 30 to 40% of a full kitchen budget, driven by both product cost and installation labor.
Cabinet quotes differ mostly on demolition assumptions. Everyone can count linear feet; not everyone prices the removal, the disposal, and the wall repair the removal exposes.
Watch the per-item extras. They are quoted separately from the linear-foot rate, which is how a job that looked straightforward can land well above the number you had in mind.
Hanging a cabinet takes the same time in a big kitchen as a small one. What changes the number is how many cabinets there are and how many walls they are spread across.
Old uppers are typically screwed directly into wall studs through a nailer strip at the top back of each cabinet, so removal without damaging the drywall behind takes more care than a straight pry-and-pull.
Older homes have usually settled more than newer ones, which changes how much adjustment a cabinet run needs. We check plumb, square, and floor level before quoting rather than discovering it on install day.
Choosing between IKEA, semi-custom, and fully custom comes down to money and fit: how much you are willing to spend for exact-fit sizing and hardware quality, against a lower price point with more assembly and adjustment work on your end.
| Cabinet tier | Lead time | Fit and adjustability | Hardware quality |
|---|---|---|---|
| IKEA (SEKTION) | In stock to a few weeks | Limited sizing, fillers needed | Standard soft-close, entry-level |
| Semi-custom | 4 to 8 weeks | Modified stock sizes, more options | Blum, Hettich-grade hardware common |
| Fully custom | 6 to 10 weeks | Built to exact kitchen dimensions | Premium European hardware |
The tier decision is really a decision about who does the assembly and how much filler the run needs. Both are labor, and both are invisible in a box price.
Semi-custom cabinets are built in standard depths and heights but offered in a wider range of widths, finishes, and interior configurations than stock lines. They typically deliver solid plywood box construction and soft-close hardware well below the price of fully custom work. For most kitchens with a standard layout, semi-custom balances fit and cost without paying for bespoke joinery the room does not need.
Certified is not the same as employed. A referral network installer may be excellent, and they may also carry less insurance than the job warrants. Both are worth checking before you book.
Ask yourself what happens if the installer is hurt on your property, or if a water line is nicked and found six months later. The answer is different depending on who carries the coverage.
The red flags to watch for include no proof of a contractor's license for jobs over California's $1,000 threshold, no liability insurance certificate offered without you asking, cash-only payment requests, and no written scope of work. Any one of these should stop you before you sign.
Appliance and plumbing tie-in work, moving a sink base cabinet, rerouting a dishwasher line, or adjusting a gas range hookup, argues for a licensed contractor. In California, moving plumbing or electrical is licensed trade work, so it should be handled by a contractor whose classification covers it, not left to whoever installs the boxes around it. An unlicensed installer who touches a gas line creates a liability that lands on the homeowner if an inspector or insurer ever asks who did the work.
Cabinet work sits on the right side of the permit line more often than not, provided nothing behind the cabinets is being moved.
Permitting becomes necessary once the project moves plumbing or gas lines, changes electrical circuits, or alters a load-bearing wall. GVD handles the permitting process with Nevada County whenever a project's scope crosses that line, so you are not the one tracking down inspections.
Permit history can come up when a home goes on the market, particularly for jobs that involved plumbing or electrical changes, since unpermitted work in those categories can slow escrow or surface during disclosure.
A straightforward cabinet installation, removal of old cabinets through final walkthrough, typically takes 2 to 4 days for a standard kitchen once the crew is on site, covering demo, wall prep, cabinet hanging, and hardware adjustment. The install days are not what stretches the calendar: custom and semi-custom cabinets carry a 4 to 10 week manufacturing lead time before the crew ever arrives.
We send this list ahead of install day. None of it is difficult, and all of it protects the schedule you were quoted.
Before signing anything, work through the list below. The answers separate a fixed price from an estimate that will move.
Everything downstream depends on the measure being right, because a cabinet order built to a wrong number is a remake rather than an adjustment. That is why the consultation is a measure rather than a sales visit.
A single project manager stays with your job from that quote through the final walkthrough, coordinating the schedule, answering questions, and checking the work at each stage rather than handing you off between separate scheduling and installation teams.
Door styles, finishes, and hardware read differently in person than on a screen, and a cabinet order goes to manufacturing at a point where changes are no longer possible. We have you handle the actual door samples, finish panels, and pulls before the run is committed, so the profile and sheen you approve are the ones that arrive. Our own in-house crews measure, deliver, and hang the same kitchen, which means a reveal that sits wrong is corrected by the person who set it. GVD gives you the full scope and one fixed price in writing, so the number you approve is the number you pay. Permitting through Nevada County is handled by us when a permit is required for the work.
GVD Renovations holds California contractor license #989637 and an A+ rating from the Better Business Bureau. GVD is the 2025 James Hardie Service Excellence Award winner, the only California contractor to receive that award that year, and holds James Hardie Elite status. We are a family-owned company that uses our own trained crews on every job, backed by full liability and workers' compensation insurance.
We work across Nevada County and neighboring jurisdictions, and where a cabinet project's scope reaches plumbing, gas, electrical, or structure, we handle that permitting process rather than leaving it to you.
Our Rocklin showroom is an easy drive from here. See cabinet materials, door styles, and hardware finishes in person before you commit to a layout.
Book the free consultation at (916) 269-0761. A GVD project manager measures the run, checks the walls for plumb and square, and gives you one fixed price covering removal, disposal, and install.
Trusted by Thousands of Homeowners Across Northern California
We bring the same crews, materials, and workmanship to every community around Alta Sierra.
A full cabinet installation in Alta Sierra — cabinets and labor — typically runs $8,000 to $30,000 depending on kitchen size, cabinet tier, and how much of the old kitchen comes out first. Fully custom cabinetry runs about $150 to $500 per linear foot.
IKEA is quickest and lowest cost but limited on sizing; semi-custom (about 4 to 8 weeks) modifies stock sizes with better hardware; fully custom (6 to 10 weeks) is built to exact dimensions for unusual layouts or specific storage needs.
Cabinets alone, in the same footprint, generally do not require a permit. One is needed once the project moves plumbing or gas lines, changes electrical circuits, or alters a load-bearing wall — and GVD handles that filing when it applies.
The install crew is usually in and out in 2 to 4 days. The longer part of a 6 to 10 week project is manufacturing lead time and your own decisions on finishes and hardware.
Refacing, meaning new doors, drawer fronts, and hinges over the existing cabinet boxes, or repainting the existing boxes, both cost less than a full replacement. Either works well when the boxes underneath are still structurally sound and the layout does not need to change.
Removal starts by unscrewing the cabinet from the nailer strip that anchors it to the wall studs, not by prying at the face frame. Countertops get unscrewed from the cabinet base and lifted clear before any cabinet comes down, which avoids cracking stone or laminate that is being reused.