
GVD designs and builds decks in Windsor and nearby Santa Rosa and Rohnert Park, with heat-conscious board colors for full-sun decks. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Windsor homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
Homeowners in Windsor hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the Town of Windsor or Sonoma County when a permit applies, and build it under California license #989637 with full insurance. We also build decks in nearby Santa Rosa, Rohnert Park, and Cotati, and every design starts with a measurement of your grade and attachment point.
The framing inspection happens while the structure is still open, before any decking hides the ledger, joists, and hangers, and there is no way to verify those connections after the surface goes down. That single checkpoint sets the build sequence, because footings and framing have to pass while everything is visible. GVD builds toward that inspection first and lays decking only after the frame is signed off.
GVD carries several decking lines rather than one, so the recommendation is not constrained by what happens to be in stock.
The framing, the footings, and the railing carry a fixed base cost that stays close to the same whether the surface is pressure-treated lumber or a capped composite. The decking material is what separates one quote from another, so knowing that split before you call tells you which part of the number you actually control.
A deck budget is really two budgets: the structure underneath, which is set by the site, and the surface on top, which is set by taste.
Below the tiers above, a small pressure-treated ground-level deck under 100 square feet sits near $5,000. It is a genuine option on a tight budget and a modest one.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
The honest summary is that composite and PVC buy you out of a refinishing cycle, and wood buys you a surface neither of them quite reproduces.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Note the cost order, because it is the reverse of the usual assumption: redwood sits above standard composite here. The wood option is a premium material rather than a budget one, so the composite decision is not about paying more now to save later.
Summer sun is the stress to design for in Windsor. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
Treating all composite as one product is the mistake. Capped and uncapped, wood-core and full PVC, are meaningfully different things sold under overlapping names.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Whenever a deck attaches at a door or rises more than a couple of feet off the ground, assume a permit until the Town of Windsor or Sonoma County confirms otherwise, since retroactive permitting costs more than filing at the outset.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the Town of Windsor or Sonoma County as part of the job.
Deck framing is governed by the same structural provisions as any exterior structure, and the inspections follow the order the load path is built in.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Sloped lots are where deck projects diverge most from a standard quote, because the structure has to follow a grade that a flat-lot design assumes away.
A deck gets designed against the actual grade at the back of the house, which is why the first visit is a measurement rather than a material conversation.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
The six stages below are the same on every deck job. What varies is how long permitting takes and what the grade requires at the footings.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Construction generally runs one to three weeks. The part that varies most is what comes before it, since plan check queues move at their own pace.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
Keeping a deck clean is mostly about preventing grit from being ground into the surface underfoot, which is why sweeping matters more than washing.
We have taken deck framing through plan review with the Town of Windsor and Sonoma County, so we know which ledger attachment and footing details reviewers and inspectors look at before a frame is approved. When a permit is required for your deck, GVD handles the permitting process and schedules the framing inspection while the structure is open. The build is run by one accountable GVD team from the first measurement to the final walkthrough, rather than rotating out-of-area crews sent in for a single job. You can also see decking boards, railing systems, and framing hardware in our showroom before you decide, so the material choice that drives the difference between quotes is one you make in person against a firm total price in a detailed digital proposal.
We bring the same crews, materials, and workmanship to every community around Windsor.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the Town of Windsor or Sonoma County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















