
A new Sebastopol deck built for damp marine air and shaded yards: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving Santa Rosa and Petaluma.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Sebastopol homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
GVD Renovations designs, permits, and builds decks in Sebastopol, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the City of Sebastopol or Sonoma County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Santa Rosa, Petaluma, and Rohnert Park, and every design starts with a measurement of your grade and attachment point.
Once the framing is closed in, no one can confirm how the ledger is fastened, how the footings bear, or how the joists connect without tearing the deck apart, which is why the open-framing inspection has no substitute. We schedule that inspection while the structure is still exposed, so the connections that hold the deck together are verified before any decking goes down. Everything after that point, from board layout to railings, follows the sequence that inspection sets.
GVD runs decks the same way it runs its siding and window work: one dedicated project manager per job, its own carpenters, and a fixed-price scope agreed before construction starts.
The redwood tier on our pricing sits above standard composite and asks for regular sealing and cleaning to stay sound over the years, so the real question before you call is whether you want that ongoing maintenance commitment. Knowing that upkeep is part of the wood choice, not an afterthought, keeps the material conversation honest from the first call.
Knowing which tier your deck falls into before you call keeps the conversation grounded, because the tiers differ by structure rather than by finish.
Composite deck replacement, standard size, $17,000 to $30,000. Capped composite boards from Trex, TimberTech, or DuraLife over pressure-treated framing, finished with composite railing. The build we do most often.
Wood deck replacement, redwood, $25,000 to $35,000. Redwood decking and railing on treated framing. A premium material rather than a budget one, which is why it sits above composite here, and it needs refinishing on a regular cycle.
Premium PVC or stone-surface deck, $30,000 to $45,000. No wood content at all: full-PVC boards, or a stone or tile surface on a waterproofed base. The top performer against moisture and stains.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Multi-level decks, covered porches, built-in lighting or seating, and waterproofed decks over living space. Structure and engineering set the price here more than the boards do.
As a floor reference, a ground-level pressure-treated deck under 100 square feet comes in near $5,000, well below the standard replacement tiers above.
Our main decking page walks through pricing in more detail.
Framing, footings, and railing carry a relatively fixed base cost regardless of what decking goes on top, which is why the surface material drives most of the difference between two quotes for the same footprint. Elevated and second-story decks sit above their ground-level equivalents because they need deeper engineered footings and additional structural support.
None of these three is wrong for every deck. What is wrong is choosing on upfront price without knowing what the upkeep commitment looks like.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Note the cost order, because it is the reverse of the usual assumption: redwood sits above standard composite here. The wood option is a premium material rather than a budget one, so the composite decision is not about paying more now to save later.
Damp, cool air shapes deck choices in Sebastopol more than summer heat does. Decks that sit in shade or get little airflow underneath are the ones that show mildew, so we pay attention to ventilation under the frame and steer shaded areas toward capped composite or PVC rather than wood.
There is no categorical quality gap between the major composite lines. There is a real gap between composite and PVC, and it shows up in the price.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Permit requirements for a deck are set by attachment, height, and size rather than by cost, so the answer for any specific project comes from the City of Sebastopol or Sonoma County.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the City of Sebastopol or Sonoma County as part of the job.
Passing inspection is not the goal in itself, but the things inspectors check are a reasonable list of the things that cause decks to fail.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
A deck on a slope has to be designed against the actual grade rather than a standard spacing pattern, and that is a survey question before it is a carpentry one.
How fast the ground falls away from the house sets the footing depth, the post sizing, and the guardrail requirement, so the site survey comes before the design.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
The six stages below are the same on every deck job. What varies is how long permitting takes and what the grade requires at the footings.
Footings and framing gate everything after them, so the schedule follows the inspections rather than the other way around.
Expect one to three weeks of build time once approvals are in hand. A ground-level deck sits at the short end and an elevated build at the long end.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
A deck sits in full sun collecting dust, pollen, and whatever falls out of the trees above it, so some routine is required whatever the material.
On a deck, the site sets the structural scope: what the ledger attaches to, whether new footings are needed, and how high the frame sits above grade all shift the work. That is exactly why we put a firm total price in a detailed digital proposal before the crew arrives, so the number you approve is the number you pay and site-driven scope does not turn into surprise charges once digging starts. Our in-house crews, who self-perform most of the work, carry that scope from the estimate through the final walkthrough, so one accountable team owns every connection. When a permit is required, GVD handles the permitting process with the City of Sebastopol or Sonoma County, and we know which framing details inspectors check before a deck can be closed in.
Our deck submittals are prepared for what the City of Sebastopol or Sonoma County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
We bring the same crews, materials, and workmanship to every community around Sebastopol.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Sebastopol or Sonoma County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















