
Decks in Union City and nearby Fremont and Hayward, designed for cool, damp bayside conditions. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
From low platforms off a back slider to elevated decks on steep lots, GVD Renovations handles deck design, permitting where required through the City of Union City or Alameda County, and construction in Union City. We are licensed (#989637) and carry liability and workers' compensation coverage. Recent site visits have ranged from Decoto and Alvarado to nearby Fremont and Hayward, and every design starts with a measurement of your grade and attachment point.
Two deck quotes are only comparable when they assume the same footprint, the same height above grade, and the same attachment to the house, because any one of those changing moves the framing and footing work underneath. GVD measures all three at the estimate, then writes one fixed total against what it finds. Ask any bidder to state the height above grade and the attachment assumption they priced, and you can line their number up against ours.
We commit to a firm total price before work starts, which is possible because the structural scope gets settled at the estimate rather than discovered during framing.
The board material you pick sets a maintenance commitment for years, not just a number on the quote, so decide how much ongoing upkeep you want before you compare tiers. Our redwood tier sits above standard composite in price, and it asks more of you over its life, which is a fair trade only if you want the look enough to maintain it.
What a deck costs is decided largely before any material is chosen, by the shape of the lot and where the deck meets the house.
Composite deck replacement, standard size, $17,000 to $30,000. Trex, TimberTech, or DuraLife boards on treated framing with composite railing. No sealing cycle, and the most common build GVD does.
Wood deck replacement, redwood, $25,000 to $35,000. Redwood decking and railing on treated framing. A premium material rather than a budget one, which is why it sits above composite here, and it needs refinishing on a regular cycle.
Premium PVC or stone-surface deck, $30,000 to $45,000. AZEK-type full-PVC decking, or stone or tile set over a waterproofed substrate, for owners who want the strongest moisture and stain resistance.
Large custom deck, covered porch, or waterproofed system, $45,000 to $100,000 and up. Covered structures, multiple levels, integrated lighting or benches, or a deck that doubles as a roof over living space. Most of the cost sits in engineering and framing.
At the very low end, a small ground-level pressure-treated deck under 100 square feet sits near $5,000, though that is the bottom of the range rather than a typical project.
For the full pricing breakdown, see our main decking page.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
A decking material has to survive full sun, standing water, and foot traffic simultaneously, which narrows the field faster than the aesthetic conversation does.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
The familiar framing, cheap wood versus expensive composite, does not describe these tiers. Redwood is the more expensive surface and it still needs refinishing, which makes composite the straightforward choice for most homeowners here.
In Union City's marine air, moisture is the bigger concern than heat. Shaded corners and the north side of a deck can stay damp long enough to grow mildew on any surface, so board spacing, airflow under the frame, and a cleaning routine matter more here than board color. Capped composite and full PVC handle the damp better than wood.
Every line here has a track record long enough to judge. The question is which color and texture you want to look at for twenty-five years.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
Whether a deck needs a permit turns on how it attaches and how high it sits. A low, freestanding platform sometimes falls outside the requirement; an attached or elevated deck typically does not. The City of Union City or Alameda County makes that call.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
GVD prepares the plans, submits for plan check, and schedules the inspections with the City of Union City or Alameda County when a permit applies, so you are not tracking down a separate expediter.
Deck code is mostly about connections. The ledger, the footings, and the guardrail are where inspections concentrate, because those are the failure points that matter.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
Where the drop is significant, stairs and landings become part of the structure rather than an accessory to it, and they carry their own code requirements.
Around Decoto and Alvarado, whether a deck is a ground-level platform or an elevated structure is decided by the fall of the individual lot rather than by the area.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
The build itself is one to three weeks for a typical replacement, which is short enough that the permit stage is often the longer half of the project.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
What composite asks of an owner is a hose and occasional soap. What wood asks is a refinishing cycle, and that is the whole difference.
Our showroom on Five Star Boulevard in Rocklin lets you stand next to full-size deck boards, handle the actual railing systems, and see finished colors under real light rather than judging from a sample chip that never matches the plank. Bring your footprint and we can walk you through the choices in person. The crews who build in Union City are part of our in-house team, one coordinated group from the estimate through the final walkthrough, not rotating out-of-area crews you meet on day one. Decks in Decoto and Alvarado fall under the City of Union City or Alameda County depending on the parcel, and when a permit is required, GVD handles the permitting process for that authority.
Having taken decks through the City of Union City or Alameda County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Union City.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Union City or Alameda County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















