
Decks in Paradise and nearby Chico and Marysville, with WUI-aware material choices for foothill lots. Composite, redwood, or PVC, framed to code at one fixed price in a detailed proposal.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →What most Paradise homeowners can expect from a GVD deck build, from the most common material to how long construction takes.
GVD Renovations designs, permits, and builds decks in Paradise, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the Town of Paradise or Butte County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. We also build decks in nearby Chico, Marysville, and Penn Valley, and every design starts with a measurement of your grade and attachment point.
The point where a deck attaches to your house, the ledger, is the detail most likely to let water into a wall when it is bolted on without proper flashing. Flashing that connection correctly the first time keeps runoff from tracking behind the ledger and into the framing behind your siding. We inspect and flash the ledger as part of the build rather than treating it as an afterthought once the boards are down.
A deck touches the house at the ledger, and that connection is where water gets into a wall if it is detailed carelessly. It is the part of the job worth asking a contractor about.
Height above grade is the single measurement that sets footing depth, how much structural support the frame needs, whether a guardrail is required, and which permit path the project follows, all at once. Knowing where your deck falls on that scale before you call keeps every cost conversation anchored to your actual site.
Knowing which tier your deck falls into before you call keeps the conversation grounded, because the tiers differ by structure rather than by finish.
A budget near $5,000 covers a small ground-level pressure-treated deck under 100 square feet. Most projects are considerably larger than that.
Our main decking page walks through pricing in more detail.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
What separates these materials in service is how each one handles sustained UV exposure and repeated wetting, not how they look in a showroom.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
The two questions worth separating are what a deck costs to build and what it costs to keep. Against redwood, composite answers both in the same direction.
Paradise's foothill climate brings hot, dry summers and wide day-to-night temperature swings. Composite and PVC boards expand and contract with that cycling, so we follow each manufacturer's gapping and fastening specifications closely, and lighter colors stay more comfortable underfoot in the afternoon sun.
The fastener and railing system is worth as much attention as the board, since it determines how the finished deck looks from three feet away.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Whether a deck needs a permit turns on how it attaches and how high it sits. A low, freestanding platform sometimes falls outside the requirement; an attached or elevated deck typically does not. The Town of Paradise or Butte County makes that call.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
When a permit is required, we draw the plans, submit them to the Town of Paradise or Butte County, and schedule each inspection ourselves.
Most of what code requires on a deck is invisible in the finished product, which is exactly why the inspection stages are sequenced the way they are.
California's residential code covers footing depth and bearing, ledger attachment to the house rim joist, joist spacing rated for the decking material's span, and guardrails for any walking surface 30 inches or more above grade. Stair rise and run and baluster spacing are checked at final inspection.
A deck is typically inspected at two or three points: footings before they are covered, framing and ledger attachment, and a final once decking, railing, and stairs are complete. Ledger flashing is a common reason for a return trip, because the house's weather-resistive barrier has to lap correctly over the ledger, so GVD flashes it to manufacturer specification on the first pass.
Many lots around Paradise sit in or near designated Wildland-Urban Interface areas, where California adds requirements for exterior construction that can affect decking material and how the deck meets the house. We check the specific product listings against current WUI code before ordering, rather than assuming a board qualifies.
Elevated construction is routine work, but it is not the same work, and a quote that prices it like a ground-level deck has missed something.
Grade is the first thing assessed at the consultation, because it determines the structure, the code requirements, and most of the cost.
When the ground falls away steeply, the deck becomes a true structure: deeper engineered footings, a ledger rated for more load, and full-height guardrails. We design the footing layout for the measured slope, not a flat-lot spacing template.
What follows is the order the work actually happens in, from the measurement through the final walkthrough.
The steps cannot overlap much: nothing goes on top until the footings and framing are signed off.
Expect one to three weeks of build time once approvals are in hand. A ground-level deck sits at the short end and an elevated build at the long end.
Allow for plan review up front when a permit is needed; its timing depends on the current queue. Elevated decks add days for footing work and inspections compared with a ground-level build.
The realistic maintenance expectation for composite is cleaning rather than refinishing, which is a meaningful difference over a decade but not the same as nothing.
Our showroom on Five Star Blvd in Rocklin lets you stand over full-size deck boards, handle the railing systems, and compare colors under real light instead of choosing from a chip the size of a business card. That matters because a board looks different at full length than it does in a sample, and railing feel is hard to judge from a catalog. Your deck is built by one accountable GVD team from the estimate through the final walkthrough, so the person who measured your ledger is accountable for how it goes in. When a permit is required, GVD handles the permitting process with the Town of Paradise or Butte County, so you are not tracking down which authority reviews your plans.
Having taken decks through the Town of Paradise or Butte County plan review before, we know what inspectors check at the ledger, footings, and guardrails.
We bring the same crews, materials, and workmanship to every community around Paradise.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
Usually, if the deck is attached to the house, more than 30 inches above grade, larger than 200 square feet, or serves as the exit from a door. Only small, low, freestanding decks are typically exempt. When a permit is required, GVD handles plans, submittal, and inspections with the Town of Paradise or Butte County.
Construction usually takes one to three weeks once permits clear. Plan check timing and elevated framing are the main variables.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















