
A new Moraga deck with heat-conscious board colors for full-sun decks: site-measured design, permits handled when required, and a detailed firm-price proposal. Also serving San Ramon and Blackhawk.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →One project manager, a detailed fixed-price proposal, and a structure designed for your lot.
GVD Renovations designs, permits, and builds decks in Moraga, from ground-level backyard platforms to elevated decks on sloped lots. Where a permit is required, the work is reviewed and inspected by the Town of Moraga or Contra Costa County. GVD holds California contractor license #989637 and carries full liability and workers' compensation insurance. Recent site visits have ranged from Sanders Ranch and Campolindo to nearby San Ramon and Blackhawk, and every design starts with a measurement of your grade and attachment point.
A deck is a structural project wearing a finish product, and the boards you see are the last decision, not the one that determines how long the structure stands. The ledger connection to the house and the footings under the frame carry the load and decide the deck's service life. GVD inspects the ledger location and measures footing conditions at the estimate, then builds the frame to match what the site requires.
Deck projects fail at the connections more often than at the surface. GVD builds the ledger and footing details to specification on the first pass rather than fixing them at reinspection.
Footings and framing make up the majority of most deck quotes, while the board selection homeowners focus on is a smaller share of the total. Knowing that the structure below the surface drives the number keeps the conversation grounded when you call.
Size and height above grade together explain most of the difference between two deck quotes for the same house.
| Deck | Typical cost | What sets it apart |
|---|---|---|
| Composite, standard size | $17,000–$30,000 | Low upkeep, the usual choice |
| Redwood | $25,000–$35,000 | Premium wood, more upkeep |
| Full PVC or stone surface | $30,000–$45,000 | No wood fiber; toughest against damp |
| Large custom, covered, or waterproofed | $45,000–$100,000+ | Framing and engineering set the price |
A budget near $5,000 covers a small ground-level pressure-treated deck under 100 square feet. Most projects are considerably larger than that.
The complete cost breakdown is on our main decking page.
Two quotes for the same footprint usually differ mainly on the surface material, since the framing, footings, and railing underneath carry a similar base cost. What pushes an elevated or second-story deck higher is the deeper footing work and added structure.
The honest summary is that composite and PVC buy you out of a refinishing cycle, and wood buys you a surface neither of them quite reproduces.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Note the cost order, because it is the reverse of the usual assumption: redwood sits above standard composite here. The wood option is a premium material rather than a budget one, so the composite decision is not about paying more now to save later.
In Moraga's hot, sunny summers, color is a comfort decision as much as a design one. Composite and PVC absorb radiant heat, so a dark board in full afternoon sun runs noticeably warmer underfoot than a light one. Manufacturers publish comparative surface-temperature data by color; ask to see it for the line you are considering, and consider a lighter color or shade for the sunniest exposure.
The brands GVD installs overlap heavily on performance. Where they differ is color range, texture, railing systems, and hidden fastener design.
We install Trex's Transcend and Enhance lines, TimberTech and its AZEK full-PVC line, and DuraLife. There is no clear quality gap between the brands; they differ on color range, texture, railing and fastener systems, and price point. What does matter is capped composite (a wood-fiber core with a protective shell) versus full PVC (no wood at all, better moisture and stain resistance, higher price).
Homeowners should expect any attached or elevated deck to be reviewed by the Town of Moraga or Contra Costa County, and should treat a proposal to skip that step as a warning rather than a saving.
Under the California Residential Code, a deck is generally exempt from permitting only when all of these hold: it is 200 square feet or smaller, no more than 30 inches above grade at any point, not attached to the house, and not serving as the required exit from a door. Once any one of those fails, which is common the moment a deck is attached at a slider or French door, the project needs a permit and inspections. Some jurisdictions add their own rules, so we confirm locally.
If your deck needs a permit, GVD handles the plan check submission and inspection scheduling with the Town of Moraga or Contra Costa County as part of the job.
Passing inspection is not the goal in itself, but the things inspectors check are a reasonable list of the things that cause decks to fail.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
An elevated deck is a different structural problem from a ground-level one, not a taller version of the same project.
A deck around Sanders Ranch and Campolindo gets scoped against the actual grade at the back of the house, since that sets the footing depth and the guardrail requirement.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
The six stages below are the same on every deck job. What varies is how long permitting takes and what the grade requires at the footings.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
The build itself is one to three weeks for a typical replacement, which is short enough that the permit stage is often the longer half of the project.
Plan check timing is the biggest unknown before construction starts. Once building begins, elevated and second-story decks take longer than ground-level ones because of deeper footings and more inspections.
The routine below takes very little time and is the difference between a deck that looks its age and one that does not.
We have taken deck plans through review with both the Town of Moraga and Contra Costa County, so we know which ledger attachment and footing details reviewers ask about before framing inspection. When a permit is required, GVD handles the permitting process and schedules inspections around it. In neighborhoods like Sanders Ranch, Campolindo, Moraga Country Club, and Rheem Valley where an HOA or architectural review may weigh in, we account for that step early rather than after framing starts. Our in-house crews, who self-perform most of the work, build the frame, so the people who set the footings are the people accountable for the finished deck. Our showroom lets you compare decking and railing options in person before you commit to a board and a fixed total price in a detailed digital proposal.
Our deck submittals are prepared for what the Town of Moraga or Contra Costa County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Moraga.
Most GVD deck replacements run $17,000 to $30,000 for a standard-size composite deck, $25,000 to $35,000 for redwood, $30,000 to $45,000 for full PVC or a stone surface, and $45,000 to $100,000 and up for large custom, covered, or waterproofed decks. Height above grade and the slope of the lot move the structural cost most.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the Town of Moraga or Contra Costa County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
On GVD's pricing, composite is both the lower-cost and lower-maintenance build; redwood prices above it and needs refinishing on a cycle. Redwood is chosen for its natural look, not to save money.
GVD installs Trex (including Transcend and Enhance), TimberTech (including AZEK full PVC), and DuraLife. The bigger choice is capped composite versus full PVC, which affects moisture resistance and price.
Yes. Decking samples, railing systems, and colors are on display at our showroom at 6848 Five Star Blvd #6 in Rocklin, or we can bring samples to your home.





















