
GVD designs and builds decks in Martinez and nearby Pleasant Hill and Alamo, built for long, hot summers and strong sun. One project manager runs the job from footings to railing.
Transform your home's exterior with timeless elegance using GVD Renovations & Remodeling' top-quality decking solutions. Our expert team has assisted numerous homeowners in bringing their dream outdoor spaces to life. Allow us to guide you in selecting the perfect materials, designing an optimal layout, and scheduling a seamless installation for your decking renovation.
Tap images to enlarge
See More Recent Projects →The shape of a typical Martinez deck project with GVD, before your own site is measured.
Homeowners in Martinez hire GVD Renovations for everything from simple ground-level decks to multi-level structures on sloped lots. We design the deck, take it through the City of Martinez or Contra Costa County when a permit applies, and build it under California license #989637 with full insurance. Recent site visits have ranged from Alhambra Valley and Vine Hill to nearby Pleasant Hill and Alamo, and every design starts with a measurement of your grade and attachment point.
The point where a deck attaches to the house, the ledger, is also the point where water reaches the wall framing if the flashing is installed carelessly. Done right, the ledger is fastened to solid framing and layered with flashing that directs water out and away before it can sit behind the boards. We flash and fasten that connection correctly on the first pass, because opening a wall later to correct it costs far more than doing it once.
Deck projects fail at the connections more often than at the surface. GVD builds the ledger and footing details to specification on the first pass rather than fixing them at reinspection.
The footings and framing under the deck, not the boards you walk on, make up the majority of most deck quotes, since that is where the structural work and labor concentrate. Board selection is the choice homeowners tend to focus on first, so knowing that the structure below drives the number keeps the budget conversation grounded.
Height above grade is the variable homeowners underestimate. It drives the footing depth, the structural support, the guardrail requirement, and the permit path all at once.
For scale at the low end: a ground-level pressure-treated deck under 100 square feet runs near $5,000, which is the smallest project worth mobilizing a crew for.
The complete cost breakdown is on our main decking page.
The structure underneath (footings, framing, railing) costs about the same whichever boards go on it, so on the same footprint the surface material explains most of the gap between quotes. Raise the deck off the ground and the structural share grows, because engineered footings and extra support come into play.
The most useful way to read the table below is by which column represents the constraint that actually binds for your household.
| Attribute | Redwood | Composite | Full PVC |
|---|---|---|---|
| Installed cost | Above standard composite | The most common build | Above both |
| Maintenance | Refinishing on a regular cycle | Rinse and mild soap, no sealing | Rinse and mild soap, no sealing |
| Surface in direct sun | Stays closer to air temperature | Darker colors absorb more heat | Darker colors absorb more heat |
| Moisture and stain resistance | Good for a natural material, but it is still wood | Strong; capped boards resist staining | Strongest of the three |
| Look | Natural grain that weathers | Consistent, wood-look texture | Consistent, the least wood-like |
Wood here means redwood, which is a premium natural material. Anyone comparing it against composite on the assumption that wood is cheaper is comparing against a product that is not on the list.
Summer sun is the stress to design for in Martinez. Dark composite and PVC boards run hotter underfoot than light ones, and unshaded redwood weathers faster under strong UV. For a south- or west-facing deck, a lighter board color, a shade structure, or both usually matter more than the brand.
The fastener and railing system is worth as much attention as the board, since it determines how the finished deck looks from three feet away.
Our lines include Trex (Transcend and Enhance), TimberTech with its AZEK PVC boards, and DuraLife. Choose among them on color, texture, railing and hidden-fastener options, and price. The real fork in the road is capped composite versus full PVC: PVC contains no wood fiber, so it resists moisture and stains best and costs more.
If the deck attaches to the house or sits more than 30 inches above grade, expect the City of Martinez or Contra Costa County to require a permit and inspections. A low freestanding structure may not trigger one.
The state exemption is narrow: a detached deck of 200 square feet or less, no more than 30 inches above grade, that is not serving as a required exit. Most decks attached to a house, larger than that, or built higher need a permit and inspections, and local amendments can be stricter.
GVD prepares the plans, submits for plan check, and schedules the inspections with the City of Martinez or Contra Costa County when a permit applies, so you are not tracking down a separate expediter.
What separates a well-built deck from a merely finished one is entirely in the details code exists to check.
Code requirements for a deck focus on structure first (footings, ledger-to-rim-joist attachment, joist spacing for the board's span) and then on safety details: guardrails at 30 inches or more above grade, stair rise and run, and baluster spacing.
Expect inspections at the footings, at framing and ledger attachment, and at final. Inspectors look closely at the ledger flashing, since the weather barrier has to lap over it rather than butt against it, and that is a detail we get right on the first visit.
A second-story deck adds an engineering dimension to the project: the ledger has to carry more, and the footings have to go deeper.
Lots in and around Alhambra Valley and Vine Hill range from level to steeply sloped, and the difference shows up in the framing rather than in the decking.
A lot where the grade drops away from the house faster than a ground-level deck can follow needs an elevated or second-story structure: engineered footings poured to depth, a ledger connection rated for the added load, and guardrails at full code height. GVD lays out footings against the actual slope rather than a standard flat-lot pattern, which is often what separates a deck that passes framing inspection from one that does not.
The six stages below are the same on every deck job. What varies is how long permitting takes and what the grade requires at the footings.
Each stage has to close out before the next begins, which is why a deck cannot be compressed the way some projects can. Footings and framing in particular gate everything after them.
Most residential deck replacements finish in one to three weeks of on-site work once permits clear.
Permit review adds time at the front end and varies with the current plan check queue. An elevated or second-story deck runs longer than a ground-level build because of the deeper footings and extra inspection stages.
Wood adds refinishing on a cycle to everything below. That is the maintenance difference between the materials, and it is the whole of it.
Our in-house carpenters, who self-perform most of the work, build the framing, set the footings, flash the ledger, and stand with you at the final walkthrough, rather than rotating out-of-area crews through the parts that matter. The connections that keep water out of a wall are the connections a stable crew gets right, because the same people who set the ledger answer for it at the end. When a permit is required in Martinez, GVD handles the permitting process with the City of Martinez or Contra Costa County, depending on where your address falls. If your project sits in Alhambra Valley, Vine Hill, or Morello Heights, we can review any HOA or architectural requirements against the plan before framing begins. You can also see and handle decking and railing options in our showroom before committing to a material.
Our deck submittals are prepared for what the City of Martinez or Contra Costa County plan reviewers and inspectors look for, which helps keep framing and final inspections on schedule.
Recent deck building projects we have completed in nearby communities:
We bring the same crews, materials, and workmanship to every community around Martinez.
A standard composite deck typically costs $17,000 to $30,000 with GVD. Redwood runs $25,000 to $35,000, premium PVC or stone surfaces $30,000 to $45,000, and large custom or covered decks $45,000 and up. Sloped lots and elevated decks cost more because of deeper footings and extra framing.
It depends on attachment, height, and size. Under the California Residential Code, a deck is generally exempt only if it is 200 square feet or smaller, no more than 30 inches above grade, freestanding, and not serving a required exit door. GVD handles any required permits through the City of Martinez or Contra Costa County.
Typically one to three weeks of construction after any required permit is issued. Elevated and second-story decks take longer because of deeper footings and extra inspections.
Composite usually wins on both price and upkeep, since GVD's wood option is redwood rather than pressure-treated pine. Choose redwood if you want real wood grain and are willing to refinish it periodically.
Trex, TimberTech and its AZEK PVC line, and DuraLife. We recommend a line based on your deck's span, height, and use rather than a single stocked product.
At our Rocklin showroom on Five Star Blvd, where you can compare boards, railing, and colors in person. Samples can also come to your house during the consultation.





















